[1] Monoaca M F,Sammarra M.The berth allocation problem:a strong formulation solved by a lagrangean approach[J] .Transportation Science,2007,41(2):265-280.
[2] Daganzo C F.The cranes scheduling problem transportation research[J] .Transportation Research Part B:Methodological,1989,23(3):159-175.
[3] 计明军,靳志宏.集装箱码头集卡与岸桥协调调度优化[J] .复旦大学学报:自然科学版,2007,46(4):476-480.
Ji Mingjun,Jin Zhihong.A united optimization of crane scheduling and yard trailer routing in a container terminal[J] .Journal of Fudan University:Natural Science,2007,46(4):476-480.
[4] 周鹏飞,康海贵.面向随机环境的集装箱码头泊位-岸桥分配方法[J] .系统工程理论与实践,2008,31(1):161-169.
Zhou Pengfei,Kang Haigui.Study on berth and quay-crane allocation under stochastic environments in container termina[J] .Systems Engineering Theory&Practice,2008,31(1):161-169.
[5] Li C L,Cai X Q,Lee C Y.Scheduling with multiple jobs on one processor pattern[J] .IIE Transaction,1998,30(5):433-445.
[6] Imai A,Nishimura E,Papadimitriou S.The dynamic berth allocation problem for a container port[J] .Transportation Research Part B:Methodological,2001,35(4):401-417.
[7] Gerald G B,Siriphong L,Katie P T.Optimizing ship berthing[J] .Naval Research Logistics,1994,41(1):1-15.
[8] Imai A,Chen H C,Nishimura E,et al.The simultaneous berth and quay crane allocation problem[J] .Transportation Research Part E:Logistics and Transportation Review,2008,44(5):900-920.
[9] Park Y M,Kim K H.A scheduling method for berth and quay cranes[J] .Container Terminals and Automated Transport Systems,2003,25(1):1-23.
[10] Sammarra M,Cordeau J F,Laporte G,et al.A tabu search heuristic for the quay crane scheduling problem[J] .Journal of Scheduling,2007,10(4/5):327-336.
[11] Tavakkoli-Moghaddam R,Makui A,Salahi S,et al.An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports[J] .Computers&Industrial Engineering,2009,56(1):241-248.
[12] Legato P,Gulli D,Trunfio R.The quay crane deployment problem at a maritime container terminal[C] //Proceedings of the 22ndEuropean Conference on Modeling and Simulation.Campora San Giovanni,Amantea(CS),Italy:[s.n.] ,2008:53-59.
[13] 靳志宏,徐奇,韩骏,等.集装箱码头泊位与岸桥联合动态调度[J] .中国科技论文在线,2011,11(6):809-814.
Jin Zhihong,Xu Qi,Han Jun,et al.United dynamic scheduling of berths and quay cranes in a container terminal with consideration of actual constraints[J] .Science Paper Online,2011,11(6):809-814.
[14] Meisel F,Bierwirth C.Heuristics for the integration of crane productivity in the berth allocation problem[J] .Transportation Research Part E:Logistics and Transportation Review,2009,45(1):196-209.
[15] Liang C J,Huang Y F,Yang Y.A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning[J] .Computers&Industrial Engineering,2009,56(3):Y1021-1028.
|