[1] 刘燕,钱育锋,马海燕,等.“5?12”汶川大地震公路恢复重建工程计价依据分析研究[R].成都:四川省交通厅交通建设工程造价管理站,2012.
Liu Yan, Qian Yufeng, Ma Haiyan, et al. An Analysis of Wenchuan 5.12 Earthquake Highway Reconstruction Project Valuation Basis [R]. Chengdu: Construction Cost Management Authority of Sichuan Department of Transportation,2012.
[2] 曹谢东.模糊信息处理及应用[M].北京:科学出版社,2003.
Cao Xiedong. Fuzzy Information Processing and Applications [M]. Beijing: Science Press,2003.
[3] [比]Kerr E E, 黄崇福, [比]阮达. 模糊集理论与近似推理[M].武汉:武汉大学出版社,2004.
Kerr E E, Huang Chongfu, Ruan Da. Fuzzy Set Theory and Approximate Reasoning[M].Wuhan:Wuhan University Press,2004.
[4] 刘志彤.基于案例模糊推理估算施工成本系统设计研究[J].山西建筑,2009,35(27):240-241.
Liu Zhitong. Research on evaluating construction cost system design based upon case-based fuzzy reasoning [J]. Shanxi Architecture,2009,35(27):240-241.
[5] 李锋刚.基于优化型案例推理的智能决策技术研究[D].合肥: 合肥工业大学,2007.
Li Fenggang. Research on Optimized Case-based Reasoning Intelligent Decision Technique [D]. Hefei: Hefei University of Technique,2007.
[6] 符海东,雷大江.区间值加权模糊推理方法[J].计算机工程与应用,2005,41(6):57-59,81.
Fu Haidong, Lei Dajiang. The weighted interval value fuzzy reasoning [J]. Computer Engineering and Applications, 2005,41(6):57-59,81.
[7] 杨德钦.施工工效学原理与方法研究[D].西安:西安建筑科技大学,2006:12-18.
Yang Deqin. Study on Principles and Methods for Construction Ergonomics [D]. Xi’an: Xi’an University of Architecture & Technology,2006:12-18.
[8] 陈陌,郭亚军,于振明.改进型序关系分析方法及其应用[J].系统管理学报,2011,20(3):352-354.
Chen Mo, Guo Yajun, Yu Zhenming. An improved method for rank correlation analysis and its application [J]. Journal of Systems & Management,2011,20(3):352-354.
[9] 张雪琴.关于“指数平滑法”的研究[J].内蒙古农业大学学报,2006,27 (4):153-156.
Zhang Xueqin. The investigation of exponential smoothing [J]. Journal of Inner Mongolia Agricultural University,2006,27(4):153-156.
[10]刘志彤,姜早龙.基于案例推理施工成本估算方法研究[J].中外建筑,2009(6):178-180.
Liu Zhitong, Jiang Zaolong. The research on construction cost based on case reasoning [J]. Chinese and Overseas Architecture,2009(6):178-180.
|