[1] 牛润明,段树金.大跨度钢管混凝土拱桥拱肋吊装过程仿真分析[J]. 城市道桥与防洪,2004(2):64-66.
NIU Runming,DUAN Shujin. Imitative analysis in hoisting course of arch ribs of large-span steel pipe concrete arch bridge[J].Urban Roads Bridges & Flood Control, 2004(2):64-66.
[2] 袁海庆, 范小春, 范剑锋. 大跨度钢管混凝土拱桥拱肋吊装预测的迭代前进算法[J].中国公路学报, 2003,16(3):48-57.
YUAN Haiqing,FAN Xiaochun,FAN Jianfeng. Iterative go-ahead method of rib-assembling predicting for long-span concrete filled steel tubular arch bridge[J]. China Journal of Highway and Transport,2003,16(3):48-57.
[3]张建民, 郑皆连, 秦荣. 大跨度钢管混凝土拱桥吊装过程的优化计算方法[J].桥梁建设, 2002(1):52-58.
ZHANG Jianmin,ZHENG Jielian,QIN Rong. A calculation method for optimizing the installation process of CFST arch bridge[J]. Bridge Construction,2002(1):52-58.
[4] 张治成,叶贵如,王云峰. 大跨度拱桥拱肋线形调整中的扣索索力优化[J]. 工程力学,2004,21(6):187-192.
ZHANG Zhicheng,YE Guiru,WANG Yunfeng. Optimization of arch rib alignment adjustment of cable force in long span arch bridge[J]. Engineering Mechanics,2004,21(6):187-192.
[5] 郝聂冰,张雪松,唐鹏胜. 大跨径钢管混凝土拱桥吊装线形控制方法研究[J]. 中外公路,2013,33(3):131-134.
HAO Niebing,ZHANG Xuesong,TANG Pengsheng. Sturdy of long-span concrete filled steel tubular arch bridge linear control methods[J]. Journal of China & Foreign Highway,2013,33(3):131-134.
[6] 李乔,卜一之,张清华. 基于几何控制的全过程自适应施工控制系统研究[J].土木工程学报,2009,42(7):69-77.
LI Qiao,BU Yizhi,ZHANG Qinghua. Whole procedure adaptive construction control system based on geometry control method[J].China Civil Engineering Journal,2009,42(7):69-77.
[7] 刘胜春,张开银,沈成武.神经网络方法在大跨度桥梁施工预拱度控制中的应用[J].武汉理工大学学报,2002,25(3):270-272.
LIU Shengchun,ZHANG Kaiyin,SHEN Chengwu. The application of neural network method in construction control for large span bridge[J]. Journal of Wuhan University of Technology, 2002,25(3):270-272.
[8] 顾安邦,常英,乐云详.重庆黄花园嘉陵江大桥施工控制[J].重庆交通学院学报,1999,18(4):54-59.
GU Anbang,CHANG Ying,LE Yunxiang. The construction control for Chongqing Huanghuayuan Jialin River bridge[J]. Journal of Chongqing Jiaotong University,1999,18(4):54-59.
[9] 胡国伟,张宇宁,张俊兵.大跨度复杂结构桥梁施工全过程结构空间受力特性研究[J]. 铁道工程学报,2010(3):42-48.
HU Guowei,ZHANG Yuning,ZHANG Junbing.Research on the space stress-distribution characteristics of long-span and complex structure bridge during the whole construction process [J].Journal of Railway Engineering Society,2010 (3):42-48.
[10]严建科,吕婷,贺拴海.有初始几何缺陷混凝土系杆拱桥极限承载力分析[J]. 西安建筑科技大学学报,2010,42(1):54-59.
YAN Jianke,LV Ting,HE Shuanhai. Ultimate load carrying capacity analysis of concrete tied arch bridges with initial geometric defects[J]. Xi’an University of Architecture & Technology,2010,42(1):54-59.
[11]程进,江见鲸,肖汝诚. 大跨度拱桥极限承载力的参数研究[J]. 中国公路学报,2003,16(2):45-47.
CHEN Jin,JIANG Jianjing,XIAO Rucheng. Parametric study of ultimate capacity of long-span arch bridges[J]. China Journal of Highway and Transport,2003,16(2):45-47.
[12]KASUGA A,ARAI H,BREEN J E,et al. Optimum cable-force adjustments in concrete cable-stayed bridge [J]. Journal of Structural Engineering,1995,121(4):685-694.
|