[1] HOMAYOUNI S M, TANG S H, MOTLAGH O. A genetic algorithm for optimization of integrated scheduling of cranes,
vehicles, and storage platforms at automated container terminals[J]. Journal of Computational & Applied Mathematics,
2014, 270:545-556.
[2] SADEGHIAN S H, HONG T S, ISMAIL N B. Integrated scheduling of quay cranes and automated lifting vehicles in
automated Container Terminal with Unlimited Buffer Space[J].Advances in Systems Science, 2014,240:599-607.
[3] 周秀丹, 胡志华. 自动化集装箱码头成组直接中转的岸桥作业调度及其遗传算法[J]. 武汉理工大学学报(交通科学与工程版), 2016,
40(4):719-724.
ZHOU Xiudan, HU Zhihua. A multi-objective genetic algorithm for quay crane scheduling problem considering group-based
strategy and direct transshipment at automated container terminal[J]. Journal of Wuhan University of Technology
(Transportation Science & Engineering), 2016, 40(4):719-724.
[4] WANG Y, KIM K H. A quay crane scheduling algorithm considering the workload of yard cranes in a container yard[ J].
Journal of Intelligent Manufacturing, 2011, 22(3):459-470.
[5] KIM K H, PARK Y M. A crane scheduling method for port container terminals[J]. European Journal of Operational
Research, 2004, 156(3):752-768.
[6] KAVESHGAR N, HUYNH N, RAHIMIAN S K. An efficient genetic algorithm for solving the quay crane scheduling problem [J
]. Expert Systems with Applications, 2012, 39(18):13108-13117.
[7] DA H J, PARK Y M, LEE B K, et al. A quay crane scheduling method considering interference of yard cranes in
container terminals[J].Springer Berlin Heidelberg,2006,4293:461-471.
[8] 乐美龙, 徐根龙, 文洪蕊.基于作业均衡的集装箱码头岸桥作业调度优化[J]. 重庆交通大学学报(自然科学版), 2016, 35(3):155 -161.
LE Meilong, XU Genlong, WEN Hongrui. Quay crane scheduling optimization considering operation balance at container
terminal[J]. Journal of Chongqing Jiaotong University (Natural Science) 2016, 35(3):155-161.
[9] CHOO S, KLABJAN D, SIMCHI-LEVI D. Multiship crane sequencing with yard congestion constraints[J]. Transportation
Science, 2010, 44(1):98-115.
[10] JUNG S H, KIM K H. Load scheduling for multiple quay cranes in port container terminals[J]. Journal of
Intelligent Manufacturing, 2006, 17(4):479-492.
[11] FU Y M, DIABAT A, TSAI I T. A multi-vessel quay crane assignment and scheduling problem: formulation and heuristic
solution approach[J]. Expert Systems with Applications, 2014, 41(15): 6959-6965.
[12] PARK T, CHOE R, OK S M, et al. Real-time scheduling for twin RMGs in an automated container yard[J]. Operations
Research-Spektrum, 2010, 32(3):593-615.
[13] VIS I F A, CARLO H J. Sequencing two cooperating automated stacking cranes in a container terminal[J].
Transportation Science, 2010, 44(44):169-182. |