[1] 王铭, 高燕梅, 周志祥,等. 钢桁-砼组合连续刚构桥墩梁固结构造及分析[J]. 公路工程, 2015, 40(4):67-73.
WANG Ming, GAO Yanmei, ZHOU Zhixiang, et al. The construc-
tion analysis of the pier-girder connection of steel truss-concrete composite continuously ridged bridge[J]. Highway
Engineering, 2015, 40(4): 67-73.
[2] 周志祥. 预应力钢桁-砼组合连续刚构桥及施工方法:中国, CN101644024[P]. 2010-02-10.
ZHOU Zhixiang. The Construction Method for Pre-Stressed Steel Truss-Concrete Composite Continuously Ridged Bridge: China,
CN101644024[P]. 2010-02-10.
[3] 周立平, 李志勇, 蔡磊. 高墩大跨度连续刚构桥施工稳定性分析[J]. 公路工程, 2014(4):226-230.
ZHOU Liping, LI Zhiyong, CAI Lei. Stability analysis of high pier and long-span continuous rigid frame bridge construction
[J]. Highway Engineering, 2014(4): 226-230.
[4] 刘琼, 李向民, 许清风. 预制装配式混凝土结构研究与应用现状[J]. 施工技术, 2014(22):9-14.
LIU Qiong, LI Xiangmin, XU Qingfeng. Present research and application of precast concrete structure[J]. Construction
Technology, 2014(22): 9-14.
[5] 耿立伟. 全装配式钢桁-混凝土组合连续刚构桥应用研究[J]. 广州建筑, 2015, 43(5):18-21.
GENG Liwei. Application research of assembled concrete steel composite continuous rigid frame truss bridge[J]. Guangzhou
Architecture, 2015, 43(5): 18-21.
[6] 刘辉. 装配式钢桁-砼组合连续刚构桥施工阶段结构性能研究[D]. 重庆:重庆交通大学, 2016.
LIU Hui. Study on the Performance of Prefabricated Steel Truss-Concrete Composite Continuous Rigid Frame Bridge during
Construction Stage[D]. Chongqing: Chongqing Jiaotong University, 2016.
[7] 张庭杰. PCSS剪力连接件极限承载力计算方法研究[D]. 重庆:重庆交通大学, 2016.
ZHANG Tingjie. Study on the Calculation Method of Ultimate Bearing Capacity of PCSS Shear Connectors[D]. Chongqing:
Chongqing Jiaotong University, 2016.
[8] CHAUDHARY S, PENDHARKAR U, NAGPAL AK. Control of creep and shrinkage effects in steel concrete composite bridges
with precast decks[J]. Journal of Bridge Engineering, 2009, 14(5): 336-345.
[9] 庞芝炯. 钢桁—砼组合连续刚构桥墩梁联结构造研究[D]. 重庆:重庆交通大学, 2014.
PANG Zhijiong. Study on the Pier-Beam Joint in Steel Truss-Concrete Composite Continuous Rigid Frame Bridge[D].
Chongqing: Chongqing Jiaotong University, 2014. |