[1] 张力霆. 尾矿库溃坝研究综述[J]. 水利学报, 2013, 44(5): 594-600.
ZHANG Liting. Summary on the dam-break of tailing pond [J]. Journal of Hydraulic Engineering, 2013, 44(5): 594-600.
[2] 赵坚,纪伟,刘志敏. 尾矿坝地质剖面概化及其对渗流场计算的影响[J]. 金属矿山, 2003(12): 24-27.
ZHAO Jian, JI Wei, LIU Zhiming. Surveying of geological section of tailings dams and its effect on seepage field calculation [J]. Metal Mine, 2003(12): 24-27.
[3] 齐清兰,张力霆,李广晶. 复杂地形尾矿库三维渗流场的数值模拟[J]. 水力发电学报, 2012, 31(1): 157-161.
QI Qinglan, ZHANG Liting, LI Guangjing. Numerical simulation of 3-D seepage field in the tailings of complex terrain [J]. Journal of Hydroelectric Engineering, 2012, 31(1): 157-161.
[4] FOURIE A B, BLIGHT G E, PAPAGEORGIOU G. Static liquefaction as a possible explanation for the Merriespruit tailings dam failure [J].Canadian Geotechnical Journal, 2001, 38: 707-719.
[5] BRIAUD J L. Case histories in soil and rock erosion: Woodrow wilson bridge, brazos river meander, normandy cliffs, and new orleans levees [J]. Journal of Geotechnical and Geoenvironmental Engineering, 2008, 134(10):1424-1447.
[6] 张兴凯, 孙恩吉, 李仲学. 尾矿库洪水漫顶溃坝演化规律试验研究[J]. 中国安全科学学报, 2011, 21(7): 118-124.
ZHANG Xingkai, SUN Enji, LI Zhongxue. Experiment study on Evolution law of tailings dam flood overtopping [J]. China Safety Science Journal, 2011, 21(7): 118- 124.
[7] YANG Y, WEI Z, CAO G, et al. A case study on utilizing geotextile tubes for tailings dams construction in China [J]. Geotextiles and Geomembranes, 2019, 47(2): 187-192.
[8] 敬小非, 尹光志, 魏作安, 等. 模型试验与数值模拟对尾矿坝稳定性综合预测[J]. 重庆大学学报, 2009, 32(3):308-313.
JING Xiaofei, YING Guangzhi, WEI Zuoan, et al. Model test and numerical simulation of tailings dam safety forecasting [J]. Journal of Chongqing University, 2009, 32(3): 308-313.
[9] 张洪武, 刘磊, 卜海磊, 等. 尾矿库溃坝模型设计及试验方法[J]. 人民黄河, 2011,33(12): 1-5.
ZHANG Hongwu, LIU Lei, BU Hailei, et al. Test and design of tailings dam model [J]. Peoples Yellow River, 2011,33(12): 1-5.
[10] 秦华礼, 马池春. 水对尾矿坝稳定性的作用机理研究[J]. 金属矿山, 2008(10): 116-119.
QING Huali, MA Chichun. Mechanism of water effect on stability of tailing dam [J]. Metal Mine, 2008(10): 116-119.
[11] 赵一姝,敬小非, 周筱,等. 筋带对尾矿坝漫坝破坏过程阻滞作用试验研究[J].中国安全科学学报,2016, 26(1): 94-99.
ZHAO Yishu, JING Xiaofei, ZHOU Xiao, et al. Experimental study on blocking action of bar strip on tailings dam overtopping [J]. China Safety Science Journal, 2016, 26(1): 94-99.
[12] 敬小非,周筱, 赵一姝,等. 筋带密度对尾矿坝漫顶破坏规律影响研究[J]. 中国安全生产科学技术, 2016, 12(8): 68-74.
JING Xiaofei, ZHOU Xiao, ZHAO Yishu, et al. Study on influence of reinforcement density on overtopping failure of tailings dam [J]. Journal of Safety Science and Technology, 2016, 12(8): 68-74.
[13] COLEMAN S E, ANDREWS D P, WEBBY M G. Overtopping breach-ing of non-cohesive homogeneous embankments [J]. Journal of Hydraulic Engineering, 2002, 128(9): 829-838.
[14] GUO J,JULIEN P. Turbulent velocity profiles in sediment-laden flows [J]. Journal of Hydraulic Research, 2001, 39(1): 11-23.
[15] ZHANG H. Vertical distribution of velocity in sediment-laden flow [J]. Journal of Sediment Research, 1995(2): 1-10. |