[1] 姚雨霖,任周宇,李忠正,等.城市给水排水[M].2 版.北京:
中国建筑工业出版社,2007:185-192.
[2] 陈玲俐,李杰.给水管网渗漏分析研究[J].地震工程与工程振
动,2003,23(l):115-121.
Chen Ling-li,Li Jie.Leakage analysis of water supply network[J].
Earthquake Engineering and Engineering Vibration,2003,23(l) :
115-121.
[3] 冯启民,高惠瑛.给水系统功能失效分析方法[J].地震工程与
工程振动,2000,20(4):80-86.
Feng Qi-min,Gao Hui-ying.Serviceability analysis of water delivery
systems[J].Earthquake Engineering and Engineering Vibration,
2000,20(4):80-86.
[4] 宋仁元.怎样防止给水系统的漏损[M].北京:中国建筑工业出
版社,1998:7-8.
[5] Hwang H,Lin H,Shinozuka M.Seismic performance assessment
of water delivery systems[J].Journal of Infrastructure Systems,
1998,4(3):118-125.
[6] Germanopoulos G.A technical nite on the inclusion of pressure dependent
demand and leakage terms in water supply network model
[J].Civil Engineering Systems,1985,2(9):171-179.
[7] 杨海军.基于MapInfo 城市给水管网拓扑关系的自动建立
[D].武汉:武汉大学,2004:20-21.
[8] 侯保俭,王渺林.长江上游径流趋势分析及分布式小时模型应用
[J].重庆交通大学学报:自然科学版,2011,30(2):291-294.
Hou Bao-jian,Wang Miao-lin.Run off trend analysis and distributed
hourly model application study of the upper reaches of Yangtze river
[J].Journal of Chongqing Jiaotong University:Natural Science,
2011,30 (2):291-294.
[9] 汤国安,李发源,刘学军.数字高程模型教程[M].2 版.北京:
科学出版社,2010:4-12. |