[1] 张多平,康炜.兰州市小西湖黄河大桥设计分析[J].兰州铁道学院学报:自然科学版,2002,21(6):69-72.
Zhang Duoping, Kang Wei, Design analysis of Xiaoxihu Yellow River bridge in Lanzhou City[J]. Journal of Lanzhou Railway University: Natural Sciences,2002,21(6):69-72.
[2] 王鹏,王根会.斜拉索单根张拉施工控制技术研究[C]//第14届全国结构工程学术会议论文集.北京:工程力学杂志社,2005:294-298.
Wang Peng, Wang Genhui. Research on single stretching construction technique of cable-stayed bridge[C]// Proceedings of 14th National Conference on Structural Engineering. Beijing: Engineering Mechanics Press,2005:294-298.
[3] 徐建红,范厚彬.锚具夹片回缩引起预应力损失的研究[J].公路,2006(7):93-96.
Xu Jianhong, Fan Houbin. A study on presstressing loss of anchorage circle caused by anchorage retraction[J]. Highway,2006(7):93-96.
[4] 胡方健,李国平.自重和索力偏差对混凝土斜拉桥施工受力状态的影响[J].同济大学学报:自然科学版,2012,40(2):191-197.
Hu Fangjian, Li Guoping. Influences of deviation of gravity and cable tension force on construction state of cable-stayed concrete bridges[J]. Journal of Tongji University: Natural Science,2012,40(2):191-197.
[5] 冷雪浩,林乐强,黄伟东.平行钢绞线斜拉索单根钢绞线张拉过程中的索力控制[J].北方交通,2008(1):83-84.
Leng Xuehao, Lin Leqiang, Huang Weidong. Control of cable force in the process of stretching the single strand of parallel strand stayed-cable[J]. Northern Communications,2008(1):83-84.
[6] 王志刚,费汉兵,单继安.钢绞线斜拉索索力均衡控制技术的探讨[J].山西建筑,2011(9):169-170.
Wang Zhigang, Fei Hanbing, Shan Ji’an. Discussion on cable force equalization control technology of the multi-strand stay cable[J]. Shanxi Architecture,2011(9):169-170.
[7] 陈林.平行钢绞线斜拉索施工技术[J].公路交通技术,2008(5):66-69.
Chen Lin, Construction technique of parallel steel stranded wire stay cable[J].Technology of Highway and Transport,2008(5):66-69.
[8] 唐顶峰,陈双庆.安康七里沟汉江大桥环氧钢绞线斜拉索安装工艺[J].预应力技术:施工技术版,2009(2):23-27.
Tang Dingfeng, Chen Shuangqing. Installing technology of epoxy-coated strand stayed-cable Ankang Qiligou Hanjiang bridge[J]. Prestress Technology: Construction Technique Edition,2009(2):23-27.
|