中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2016, Vol. 35 ›› Issue (3): 17-21.DOI: 10.3969/j.issn.1674-0696.2016.03.04

• Bridge & Tunnel Engineering • Previous Articles     Next Articles

Disease Cause of Severe Deviation of Transfer Piers of Continuous Beam Bridge

TIAN Shiqing, WANG Junxin, SHI Qingfan   

  1. (Chongqing Qiaodu Bridge Technology Co., Ltd., Chongqing 400015, P.R.China)
  • Received:2015-02-12 Revised:2015-07-29 Online:2016-06-20 Published:2016-06-20
  • Contact: 王俊新(1986—),男,河北秦皇岛人,工程师,主要从事桥隧检测及加固维修方面的研究。E-mail: 18896017358@189.com。

连续梁桥交接墩严重偏移病害原因研究

田世清,王俊新,石庆凡   

  1. (重庆桥都桥梁技术有限公司,重庆 400015)
  • 作者简介:第一作者:田世清(1971—),男,四川达州人,高级工程师,主要从事桥隧维修加固、桥梁健康监测方面的研究。E-mail: 13308390607@189.cn。

Abstract: According to the investigation results of the installation defects of basin rubber support and deviation disease of transfer piers, the causes of severe deviation disease of transfer piers of continuous beam bridge were revealed by the analysis on the data of 39 bridges, 130 bridge piers and 1 268 supports at the construction site and the anatomy analysis on some damaged supports. The analysis indicates that the deviation damage is easy to occur at transfer piers of the continuous beam bridge in such cases, the un-horizontal installation of bearing support surface, the large deviation of the installation of the support roof and support center and under the combined action of the force of the beam expansion under the temperature difference.

Key words: bridge engineering, continuous beam bridge, transfer piers, severe deviation, causes of disease

摘要: 以盆式橡胶支座安装缺陷和墩柱偏移病害调查结果为依据,对施工现场39座桥梁,130个桥墩(台),1 268个支座的数据进行分析,并对部分损坏支座进行解剖分析,揭示了连续梁桥交接墩严重偏移病害的原因。分析表明:支座支撑面安装不水平、支座顶板与支座中心位置安装存在较大偏离和温差变化时梁体伸缩产生的力的共同作用下,连续梁桥交接墩容易出现偏移破坏。

关键词: 桥梁工程, 连续梁桥, 交接墩, 严重偏移, 病害原因