[1] 张伟.菏泽市丹阳路大桥设计[J].桥梁建设,2016,45(3):88-92.
ZHANG Wei. Design of Danyangroad bridge in Hezecity[J]. Bridge Construction, 2016, 45(3): 88-92.
[2] 晏敬东,雷运华,任红军,等.北京市西六环丰沙铁路分离式立交桥主要施工技术[J].桥梁建设,2010(2):65-68.
YAN Jingdong, LEI Yunhua, REN Hongjun, et al. Principal construction techniques for Beijing west ring road No.6 grade separation bridge over Fengtai-Shacheng
railway[J]. Bridge Construction, 2012(2): 65-68.
[3] 毛锁明.石环公路跨石太铁路斜拉桥转体施工技术[J].铁道工程学报,2009(1):58-62.
MAO Suoming. Twist construction technique for cable-stayed bridge of Shihuan highway crossing Shijiazhuang-Taiyuan railway[J].Journal of Railway
EngineeringSociety, 2009(1): 58-62.
[4] 申国朝.郑州市解放路跨线桥主桥设计与施工[J].桥梁建设,2012,42(5):57-62.
SHEN Guochao. Design and construction of main bridge of Jiefang road overpass bridge in Zhengzhou city[J].Bridge Construction, 2012, 42(5): 57-62.
[5] 周继,王新国,严定国,等.武汉市杨泗港快速通道跨线斜拉桥总体设计[J].桥梁建设,2018,48(6):87-92.
ZHOU Ji, WANG Xinguo, YAN Dingguo, et al. Overall design ofthe overpass cable-stayed bridge of Yangsigang expressway in Wuhan[J].Bridge Construction, 2018, 48
(6): 87-92.
[6] 张万志,刘华,张峰,等.斜拉桥塔梁同步施工过程的力学特性[J].山东大学学报(工学版),2016,46(6):121-126.
ZHANG Wanzhi, LIU Hua, ZHANG Feng, et al. Mechanical properties of tower and beam synchronous construction of cable-stayed bridge[J].Journal of Shandong
University(Engineering Sciences), 2016, 46(6): 121-126.
[7] 戴公连,粟淼,刘文硕,等.槽型断面梁斜拉桥塔梁墩固结区受力特性研究[J].湖南大学学报(自然科学版),2014,41(1):27-32.
DAI Gonglian, SU Miao, LIU Wenshuo, et al. Stress analysis of pier-tower-girder fixed region of cable-stayed bridge with trough girder[J]. Journal of Hunan
University(Natural Sciences), 2014, 41(1): 27-32.
[8] 王立峰,王二强,孙永存,等.万吨级斜拉桥转体施工过程的力学特性[J].交通运输工程学报,2015,15(3):52-61.
WANG Lifeng, WANG Erqiang, SUN Yongcun, et al. Mechanical properties of ten thousand-ton class cable-stayed bridge in rotation construction process[J].Journal of
Traffic and Transportation Engineering, 2015, 15(3): 52-61.
[9] 吴海军,刘健,张雷.平转连续梁桥主梁现浇施工中的摩阻效应[J].重庆交通大学学报(自然科学版),2013,32(2):183-186.
WU Haijun, LIU Jian, ZHANG Lei. Friction effect of girder of horizontal swing continuous beam bridge incast-in-site construction[J].Journal of Chongqing Jiaotong
University(Natural Science), 2013, 32(2): 183-186.
[10] 韩均,徐素芳,吴海军.现浇分段长度对平转连续梁桥受力的影响[J].重庆交通大学学报(自然科学版),2012,31(6):1113-1115.
HAN Jun, XU Sufang, WU Haijun.Effect of segmented cast-in-place length on mechanical behavior of continuous beam bridge constructed by rotary method[J].Journal
of Chongqing Jiaotong University(Natural Science), 2012, 31(6): 1113-1115.
[11] 吴海军,刘健,张雷,等.摩阻效应对现浇平转连续梁桥转体前变形的影响[J].重庆交通大学学报(自然科学版),2012,31(增刊1):665-667.
WU Haijun, LIU Jian, ZHANG Lei, et al. Friction effect on deformation before rotation of horizontal swing continuous beam bridge[J].Journal of Chongqing Jiaotong
University(Natural Science), 2012, 31(Sup1): 665-667.
[12] 文鹏,陈桥枫,杨风帆.基于改进SSI的大跨斜拉桥模态参数识别研究[J].重庆交通大学学报(自然科学版),2020,39(1):45-50.
WEN Peng, CHEN Qiaofeng, YANG Fengfan. Modal parameter identification for large span cable-stayed bridge based on improved stochastic subspace identification[J].
Journal of Chongqing Jiaotong University(Natural Science), 2020, 39(1): 45-50.
[13] 中华人民共和国交通运输部.公路桥涵施工技术规范:JTG/T 3650—2020[S].北京:人民交通出版社股份有限公司,2020.
Ministry of Transport of the Peoples Republic of China.Technical Specifications for Construction of Highway Bridges and Culverts: JTG/T 3650—2020[S]. Beijing:
China Communications Press Co., Ltd., 2020.
[14] British Standards Institution.Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework: BS 5975: 2008+A1: 2011
[S].London: BSI, 2011.
[15] 孟庆军.木质材料间摩擦性能及其对木结构设计的影响研究[D].哈尔滨:东北林业大学,2010.
MENG Qingjun.The Study for Frictional Properties of Wooden Materials and the Impact on Wood Structure Design[D]. Harbin: Northeast Forestry University, 2010. |