中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2015, Vol. 34 ›› Issue (1): 127-130.DOI: 10.3969/j.issn.1674-0696.2015.01.27

Previous Articles     Next Articles

Quantitative Study of Site Construction Labor Demand for Building Engineering in Chongqing

Zhao Bin, Lin Shitong   

  1. School of Construction Management & Real Estate, Chongqing University, Chongqing 400045, China
  • Received:2014-07-29 Revised:2014-10-24 Online:2015-02-15 Published:2015-03-10

重庆市房屋建筑工程技术工人数量配备研究

赵彬,林仕通   

  1. 重庆大学 建设管理与房地产学院,重庆 400045
  • 作者简介:赵彬(1966—),男,重庆人,副教授,主要从事建筑工程项目管理、建筑信息模型、房地产等方面的研究。E-mail:303081336@qq.com。

Abstract: The problems of site construction labor demand for building engineering in Chongqing were put forward and discussed to optimize the allocation of skilled workers, facilitate human resources planning and budgeting, improve systemization and standardization of construction management, enhance the capability in overall management and construction and ensure the engineering quality and safety. The trades of skilled workers in site construction and essential factors which influenced the allocation of skilled workers were determined, and the project category was classified. On the basis of field research, questionnaires and experts interview, the labor demand forecasting model for the allocation of skilled workers in building engineering at project level was developed, with the site construction experience into consideration. Finally, the model was tested and validated through five completed building engineering projects. It is concluded that the model can serve as a practical and advanced tool for predicting the labor demand for the skilled workers.

Key words: building engineering, site construction, labor demand

摘要: 为促进房屋建筑工程现场施工技术工人配备工作,优化建筑施工企业人力资源,推进施工管理标准化、规范化,提升施工企业综合施工能力和管理水平,控制工程预算,提高工程质量 ,确保安全生产,以重庆市建筑市场为背景,探讨了一般民用房屋建筑工程现场施工技术工人数量配备问题;确定了现场施工技术工人工种和影响技术工人数量配备的主要因素,并进一步划 分了工程类别。在实地调研、问卷调查和专家访谈的基础上,结合实际施工经验,建立了一般民用房屋建筑工程技术工人数量配备模型。最后,利用5个已完房屋建筑工程实际数据进行模型验 证,结果表明:该模型是指导技术工人数量配备的有效工具。

关键词: 房屋建筑工程, 现场施工, 工人数量配备

CLC Number: