[1] ELEFTERIADOU L, ROESS R P, MCSHANE W R. Probabilistic nature of breakdown at freeway merge junctions[J]. Transportation Research Record Journal of the Transportation Research Board, 1995, 1484(1484): 80-89.
[2] MINDERHOUD M M, BOTMA H, BOVY P H L. Assessment of roadway capacity estimation methods[J]. Transportation Research Record Journal of the Transportation Research Board, 1996, 1572(1): 59-67.
[3] PERSAUD B, YAGAR S, BROWNLEE R. Exploration of the breakdown phenomenon in freeway traffic[J]. Transportation Research Record Journal of the Transportation Research Board, 1998, 1634(1): 64-69.
[4] DONG Jing, MAHMASSANI H S. Flow breakdown, travel reliability and real-time information in route choice behavior[J]. Transportation and Traffic Theory 2009: Golden Jubilee, 2009, 34(28): 675-695.
[5] 黄大荣,沈利兵,赵玲.基于复杂网络理论的城市路网脆弱性研究[J].重庆交通大学学报(自然科学版),2015,34(1):110-115.
HUANG Darong, SHEN Libing, ZHAO Ling. Research on urban road network vulnerability based on complex network theory[J]. Journal of Chongqing Jiaotong University (Natural Science), 2015, 34(1): 110- 115.
[6] GEISTEFELDT J, BRILON W. A comparative assessment of stochastic capacity estimation methods[J]. Transportation and Traffic Theory 2009: Golden Jubilee, 2009, 34(28): 583-602.
[7] TOORENBURG J. Practical values for main road capacity[J]. Verkeers-kunde, 1986, 37(6): 280-283.
[8] WU Ning. A stochastic model for reliability analysis in freeway networks[J]. Procedia-Social and Behavioral Sciences, 2013, 96(6): 2823-2834.
[9] ELEFTERIADOU L, KONDYLI A, WASHBURN S, et al. Proactive ramp management under the threat of freeway-flow breakdown[J]. Procedia-Social and Behavioral Sciences, 2011,16: 4-14.
[10] 章洵,陈铮铮,杨超.基于随机通行能力的快速路运行评价[J].武汉理工大学学报(交通科学与工程版),2016,40(1):71-76.
ZHANG Xun, CHEN Zhengzheng, YANG Chao. Expressways operation evaluation method during the whole design period based on stochastic capacity[J]. Journal of Wuhan University of Technology(Transportation Science and Engineering), 2016, 40(1): 71-76.
[11] BRILON W, GEISTEFELDT J, REGLER M. Reliability of freeway traffic flow: a stochastic concept of capacity[C]∥ Proceedings of the 16th International Symposium on Transportation and Traffic Theory. College Park, Maryland, 2005: 125-144.
[12] 张雄飞,李瑞敏,李宏发,等.基于Monte Carlo的行程时间可靠性研究[J].武汉理工大学学报(交通科学与工程版),2012,36(4):667-670.
ZHANG Xiongfei, LI Ruimin, LI Hongfa, et al. Study on travel time reliability based on Monte Carlo method[J]. Journal of Wuhan University of Technology (Transportation Science and Engineering), 2012, 36(4): 667-670.
[13] 邵长桥,杨乔乔.路侧停车行为对基本路段通行能力的影响分析[J].重庆交通大学学报(自然科学版),2018,37(1):80-84.
SHAO Changqiao, YANG Qiaoqiao. Analysis of the influence of roadside parking behavior on the traffic capacity of basic sections [J]. Journal of Chongqing Jiaotong University(Natural Science), 2015, 34 (1): 110-115.
[14] YANG Chao, CHEN Zhengzheng, HUA Chenrui. Influence factor analysis of stochastic capacity of Shanghai expressway segment[J]. Procedia-Social and Behavioral Sciences, 2013, 96(6): 2497-2505.
[15] BRILON W, GEISTEFELDT J, ZURLINDEN H. Implementing the concept of reliability for highway capacity analysis[J]. Journal of the Transportation Research Board, 2007, 2027: 1-8.
[16] THEORYLORENZ M, ELEFTERIADOU L. Defining freeway capacity as function of breakdown probability[J]. Journal of the Transportation Research Board, 2001, 1776(1): 43-51. |