[1]Einstein H H.Risk and risk analysis in rock engineering[J].Tun-neling and Undegrorund Space Technology,1996,11(5):141-155.
[2]Burland J.On the Generalized Stress-Strain Behavior of West City[M]//William Johnson,Peter Bassindale Mellor.Engineering Plas-ticity.Cambridge:Cambridge University Press,1998:535-609.
[3]ITA Working Group No.2.Guidelines for tunneling risk manage-ment[J].Tunneling and Underground Space Technology,2004,19(9):217-237.
[4]王岩,黄宏伟.地铁区间隧道安全评估的层次——模糊综合评判法[J].地下空间,2004,24(3):301-305.
WANGYan,HUANG Hong-wei.Hierarchy-fuzzy comprehensivejudgment for safety evaluation of metro running tunnel[J].Under-ground Space,2004,24(3):301-305.
[5]黄宏伟.隧道及地下工程建设中的风险管理研究进展[J].地下空间与工程学报,2006(2):13-20.
HUANG Hong-wei.State-of-the-art of the research on risk manage-ment in construction of tunnel and underground works[J].Jounalof Underground Space and Engineering,2006(2):13-20.
[6]范玉祥,何亚伯,汪琴,等.隧道施工安全风险的模糊综合评判[J].华中科技大学学报:城市科学版,2010(3):46-50.
FAN Yu-xiang,HE Ya-bo,WANG Qin,et al.Fuzzy synthetic evalu-ation on safety risk of tunnel construction[J].Journal of HuazhongUniversity of Science and Technology:Urban Science,2010(3):46-50.
[7]GB50157—2003地铁设计规范[S].北京:中华人民共和国建设部,2003.
[8]茅为中,王云龙,张念.地铁隧道覆跨比和高跨比对地面沉降的影响[J].隧道建设,2010,6(3):242-245.
MAO Wei-zhong,WANG Yun-long,ZHANG Nian.Influence ofcover-span ratios and height-span ratios of metro tunnels on groundsurface settlement[J].Tunnel Construction,2010,6(3):242-245.
[9]博嘉科技.有限元分析软件—ANSYS融会与贯通[M].北京:中国水利水电出版社,2002.
[10]谭建国.使用ANSYS进行有限元分析[M].北京:北京大学出版社,2002.
[11]胡文清,郑颖人.木寨岭隧道软弱围岩段施工方法及数值分析[J].地下空间,2004,24(2):194-197.
HU Wen-qing,ZHENG Yin-ren.Construction technique and nu-merical simulation analysis for the Muzhailing Tunnel with weaksurrounding[J].Underground Space,2004,24(2):194-197.
|