[1] 王俊杰,张慧萍,刘明维,桩-承台-挡墙组合支挡结构:2013020080062.9[P].2013-07-24.
WANG Junjie, ZHANG Huiping, LIU Mingwei. A Composite Retaining Structure of Pile, Platform and Wall:213020080062.9[P]. 2013-07-24.
[2] 罗裕明.浅析新型支挡结构在铁路运营线中的应用优势[J].路基工程,2005(5):90-91.
LUO Yuming. An analysis of the advantages of the new retaining structure in the railway line[J]. Subgrade Engineering, 2005(5):90-91.
[3] WANG Junjie, LIANG Yue, ZHANG Huiping, et al. A loess landslide induced by excavation and rainfall[J]. Landslides, 2014, 11(1):141-152.
[4] SARMA S K. Determination of critical slip surface in slope analysis[J].Géotechnique,2006, 56(8):539-550.
[5] WANG Junjie, ZHANG Huiping, ZHANG Liang. Experimental study on heterogeneous slope responses to drawdown[J]. Engineering Geology, 2012, 147-148:52-56.
[6] YAN Zongling, WANG Junjie, CHAI Hejun. Influence of water level fluctuation on phreatic line in silty soil model slope[J]. Engineering Geology, 2010, 113:90-
98.
[7] WANG Junjie, ZHAO Di, LIANG Yue, et al. Angle of repose of landslide debris deposits induced by 2008 Sichuan Earthquake[J]. Engineering Geology, 2013, 156:
103-110.
[8] WANG Junjie, ZHANG Huiping, CHAI Hejun, et al. Seismic passive resistance with vertical seepage and surcharge[J]. Soil Dynamics and Earthquake Engineering,
2008, 28(9):728-737.
[9] 李海光. 新型支挡结构设计与工程实例[M]. 北京:人民交通出版社, 2011.
LI Haiguang. Design and Engineering Example of New Retaining Structure[M]. Beijing:China Communications Press, 2011.
[10] 张敏.桩基托梁挡土墙结构的计算模式分析[J].人民黄河, 2012, 34(5):147-148.
ZHANG Min. Model analysis of the wall structure of the retaining pile foundation beam[J].Yellow River, 2012, 34(5):147-148.
[11] 赖紫辉.桩基托梁挡土墙托梁受力分析[J].路基工程,2008(6):48-49.
LAI Zihui.The force analysis of pile bearing platform[J]. Subgrade Engineering, 2008(6):48-49.
[12] 封志军. 考虑桩-梁协调作用的桩基托梁计算理论[J].铁道工程学报,2012, 6(6):33-36.
FENG Zhijun.Calculation of pile foundation underpinning pile beam coordination effect[J]. Journal of Railway Engineering Society, 2012, 6(6):33-36. |