[1] 住房和城乡建设部计划财务与外事司,中国建筑业协会.2016年建筑业发展统计分析[R/OL].(2017-05-23)[2017-06-01].
http://www.mohurd.gov.cn/xytj/tjzljsxytjgb/xjxxqt/w02017052321
346623070743428.pdf 0K.
Ministry of Housing and Urban Rural Development, Planning Finance and Foreign Affairs Division, China Construction Association.
Statistical Analysis on the Development of Construction Industry in 2016 [R/OL]. (2017-05-23) [2017-06-
01].http://www.mohurd.gov.cn/xytj/tjzljsxytjgb/xjxxqt/w02017052321346623070743428.pdf 0K.
[2] 彼得·德鲁克. 管理的实践[M].齐若兰译.北京:机械工业出版社,2009:300.
DRUCKER P F. The Practice of Management[M]. QI Ruolan, Translation. Beijing: China Machinery Press, 2009: 300.
[3] 郭亚军.综合评价理论、方法与拓展[M].北京:科学出版社,2012:1-2.
GUO Yajun. The Theory, Method and Expansion of Comprehensive Evaluation[M]. Beijing: Sciences Press, 2012: 1-2.
[4] 柯洪,周付彦. 公路工程造价管理绩效评价指标体系研究[J]. 公路交通科技, 2012(12):48-54,68.
KE Hong, ZHOU Fuyan. Research on performance evaluation index system of highway construction cost management[J]. Journal of Highway
and Transportation Research and Development, 2012(12): 48-54, 68.
[5] LU Wenxue, HUA Yuanyuan, ZHANG Sujuan. Logistic regression analysis for factors influencing cost performance of design-bid- build
and design-build projects[J]. Engineering, Construction and Architectural Management, 2017, 24(1): 118-132.
[6] 党晓旭,张华,王元庆,等.公路建设项目造价管理绩效优化计算方法[J].中国公路学报,2016,29(5):124-129,150.
DANG Xiaoxu, ZHANG Hua, WANG Yuanqing, et al. Performance optimization measurement method of cost management for highway construction
project[J]. China Journal of Highway and Transport, 2016, 29(5): 124-129, 150.
[7] KIM B C. Probabilistic evaluation of cost performance stability in earned value management[J]. Journal of Management in
Engineering, 2016, 32(1): 04015025.
[8] MINCHIN R E, LI Xiaoxiao, ISSA R R, et al. Comparison of cost and time performance of design-build and design-bid-build delivery
systems in Florida[J]. Journal of Construction Engineering and Management, 2013, 139(10): 04013007.
[9] GRAU D,BACK W E. Predictability index: novel metric to assess cost and schedule performance[J]. Journal of Construction
Engineering and Management, 2015, 141(12): 04013007.
[10] 吕琨.施工企业项目管理系统应用研究[J].铁道工程学报,2011,154(7):117-124.
LV Kun. Research onapplication of project management system of construction enterprise[J]. Journal of Railway Engineering Society,
2011, 154(7): 117-124.
[11] 陈志鼎,邹其伦. 基于熵权的水电EPC工程项目成本风险分析与评价[J]. 水电能源科学,2015,33(2):168-171.
CHEN Zhiding, ZOU Qilun. Risk analysis and evaluation of hydropower EPC project cost based on entropy weight[J]. International
Journal Hydroelectric Energy, 2015, 33(2): 168-171.
[12] 李志林.可拓综合评价方法及其应用特色[J].广东工业大学学报, 2000,17(2):105-108.
LI Zhilin. The method of extension synthesis assessment and its applied features[J]. Journal of Guangdong University of Technology,
2002, 17(2): 105-108.
[13] 杨春燕.可拓创新方法[M].北京:科学出版社,2017:119-123.
YANG Chunyan. Extension Innovation Method[M]. Beijing: Sciences Press, 2017: 119-123. |