[1] 王桢,罗波,吴海军,等.大跨径自锚式悬索桥几何非线性行为分析[J].重庆交通大学学报(自然科学版),2015,34(02):1-6.
WANG Zhen, LUO Bo, WU Haijun, et al..Analysis of geometric nonlinear behavior of self-anchored suspension bridge of large span[J]. Journal of Chongqing Jiaotong University(Natural Science), 2015, 34(2): 1-6.
[2] 石虎强,郝胜利,孙茂,等.泰州长江公路大桥三塔悬索桥牵引系统设计与施工[J].公路,2017(3):301-306.
SHI Huqiang, HAO Shengli, SUN Mao, et al. Design and construction of traction system for three-tower suspension bridge of Taizhou Changjiang highway bridge[J]. Highway, 2017(3): 301-306.
[3] 张成瑞.悬索桥主缆PPWS法架设中质量通病及解决措施[J].北方交通,2018(2):13-16.
ZHANG Chengrui. Common quality problems in erection of main cable of suspension bridge with PPWS method and solving measures[J]. Northern Communications, 2018(2): 13-16.
[4] 刘家奎,罗浩,杜斌.钢桁梁悬索桥成缆阶段锚跨索力调整方法[J].重庆交通大学学报(自然科学版),2020,39(2):50-54.
LIU Jiakui, LUO Hao, DU Bin. Adjusting method for anchor-span cable force of steel truss suspension bridge in the cabling phase[J]. Journal of Chongqing Jiaotong University (Natural Science), 2020, 39(2): 50-54.
[5] 林一宁,余屏孙,林亚超.悬索桥架设期间主缆温度测试研究[J].桥梁建设,1997(3):60-68.
LIN Yining, YU Pingsun, LIN Yachao. Measurement and analysis of temperature of the main cable during the erection of suspension Bridges[J]. Bridge Construction, 1997(3): 60-68.
[6] 张劲泉,徐岳,鲜正洪.悬索桥主缆架设阶段灰色控制系统的研究[J].西安公路交通大学学报,1997,17(4):53-57.
ZHANG Jinquan, XU Yue, XIAN Zhenghong. Study on grey forecasting control for construction of suspension bridge cables[J]. Journal of Xian Highway University, 1997, 17(4): 53-57.
[7] 王海城,肖军,郭湘,等.一种新的自锚式悬索桥基准索股线形控制方法[J].重庆交通大学学报(自然科学版),2020,39(7):60-65.
WANG Haicheng, XIAO Jun, GUO Xiang, et al. A new method for alignment control of datum strand of self-anchored suspension bridge[J]. Journal of Chongqing Jiaotong University (Natural Science), 2020, 39(7): 60-65.
[8] 谭红梅,袁帅华,肖汝诚.大跨度悬索桥的基准索股调整[J].中国铁道科学,2010,31 (1):38-43.
TAN Hongmei, YUAN Shuaihua, XIAO Rucheng. The adjustment of datum strand of long-span suspension bridges[J]. China Railway Science, 2010, 31(1): 38-43.
[9] 李传习.现代悬索桥静力非线性理论与实践[M].北京:人民交通出版社,2014.
LI Chuanxi. Static Nonlinear Theory and Practice of Modern Suspension Bridge[M]. Beijing: Chinese Communications Press, 2014.
[10] 何为.大跨径悬索桥施工监控中若干问题的研究[D].杭州:浙江大学,2006.
HE Wei.Study of Construction Control of Long-Span Suspension Bridge[D]. Hangzhou: Zhejiang University, 2006.
[11] 邓小康,徐恭义.一种悬索桥主缆计算的新方法[J].铁道学报,2019,41(5):133-141.
DENG Xiaokang, XU Gongyi. New method for calculating main cable of suspension bridge[J]. Journal of the China Railway Society, 2019, 41(5): 133-141.
[12] 朱明.空间缆索体系悬索桥施工过程精细化分析[D].成都:西南交通大学,2017.
ZHU Ming. Meticulous Construction Analysis of Spatial Cable-System Suspension Bridge[D]. Chengdu: Southwest Jiaotong University, 2017.
[13] 李传习.混合梁悬索桥非线性精细计算理论及其应用[D].长沙:湖南大学,2006.
LI Chuanxi. Theory and Application of Nonlinear Precise Calculation of Hybrid Girder Suspension Bridge[D]. Changsha: Hunan University, 2006.
[14] 杨国俊.非对称悬索桥静力性能及动力特性分析[D].西安:长安大学,2016.
YANG Guojun. Analysis of Static Behavior and Dynamic Property for Asymmetry Suspension Bridge[D]. Xian: Changan University, 2016.
[15] 杨勇.非对称悬索桥主缆线形程序开发与参数分析[D].重庆:重庆交通大学,2010.
YANG Yong.Development and Parameter Analysis of Main Cable Line Shape Program for Asymmetric Suspension Bridge[D]. Chongqing: Chongqing Jiaotong University, 2010. |