[1] 石振明, 张公鼎, 彭铭, 等. 堰塞坝体材料渗透特性及其稳定性研究[J]. 工程地质学报, 2017, 25(5): 1182-1189.
SHI Zhenming, ZHANG Gongding, PENG Ming, et al. Study on the permeability and stability of landslide dam materials[J]. Journal of Engineering Geology, 2017, 25(5): 1182-1189.
[2] COSTA J E, SCHUSTER R L. The formation and failure of natural dams[J]. Geological Society of America Bulletin, 1988, 100(7): 1054-1068.
[3] SCHUSTER R L,ALFORD D. Usoi landslide dam and lake Sarez, Pamir Mountains, Tajikistan[J]. Environmental and Engineering Geoscience, 2004, 10(2): 151-168.
[4] SCHMOCKER L, HAGER W H. Modelling dike breaching due to overtopping[J]. Journal of Hydraulic Research, 2009, 47(5): 585-597.
[5] 刘杰, 颜婷, 周传兴, 等. 初始含水率及人工干预对堰塞坝溃决影响试验研究[J]. 重庆交通大学学报(自然科学版), 2019, 38(3): 60-67.
LIU Jie, YAN Ting, ZHOU Chuanxing, et al. Experimental investigation of landslide dam failure influenced by initial moisture content and manual intervention[J]. Journal of Chongqing Jiaotong University (Natural Science), 2019, 38(3): 60-67.
[6] 石振明, 张公鼎, 彭铭, 等. 考虑河床坡度和泄流槽横断面影响的堰塞坝溃决过程试验研究[J]. 水文地质工程地质, 2022, 49(5): 73-81.
SHI Zhenming, ZHANG Gongding, PENG Ming, et al. An experimental study of the breaching process of landslide dams with different bed slopes and drainage channel cross-sections[J]. Hydrogeology & Engineering Geology, 2022, 49(5): 73-81.
[7] 陈晓清, 崔鹏, 赵万玉, 等. “5·12” 汶川地震堰塞湖应急处置措施的讨论——以唐家山堰塞湖为例[J]. 山地学报, 2010, 28(3): 350-357.
CHEN Xiaoqing, CUI Peng, ZHAO Wanyu, et al. A discussion of emergency treatment of dammed lake caused by “5·12” Wenchuan earthquake[J]. Journal of Mountain Science, 2010, 28(3): 350-357.
[8] 徐富刚, 杨兴国, 周家文. 堰塞坝漫顶破坏溃口演变机制试验研究[J]. 重庆交通大学学报(自然科学版), 2015, 34(6): 79-83.
XU Fugang, YANG Xingguo, ZHOU Jiawen. Experimental study on dyke evolution mechanism in dam-break process of landslide dam[J]. Journal of Chongqing Jiaotong University (Natural Science), 2015, 34(6): 79-83.
[9] XU Fugang, ZHOU Hongwei, ZHOU Jiawen, et al. A mathematical model for forecasting the dam-break flood routing process of a landslide dam[J]. Mathematical Problems in Engineering, 2012, 2012: 139642.
[10] 谢忱, 李从江, 杨兴国, 等. 基于物理模型试验的堰塞坝冲刷溃决过程研究[J]. 工程科学与技术, 2021, 53(6): 43-53.
XIE Chen, LI Congjiang, YANG Xingguo, et al. Erosion and breach of landslide dam based on physical model tests[J]. Advanced Engineering Sciences, 2021, 53(6): 43-53.
[11] 赵万玉, 陈晓清, 高全, 等. 不同横断面泄流槽的地震堰塞湖溃决实验研究[J]. 泥沙研究, 2011(4): 29-37.
ZHAO Wanyu, CHEN Xiaoqing, GAO Quan, et al. Experimental study of dam-break of earthquake barrier lake with different cross sections of drainage channel[J]. Journal of Sediment Research, 2011(4): 29-37.
[12] 李霄, 陈华勇, 阮合春, 等. 堰塞坝溃决过程中孔隙水压力变化规律[J]. 科学技术与工程, 2022, 22(34): 15304-15311.
LI Xiao, CHEN Huayong, RUAN Hechun, et al. Variation of pore water pressure during barrier dam break[J]. Science Technology and Engineering, 2022, 22(34): 15304-15311. |