[1] 王春平.沥青混合料拌和楼控制精度及其影响研究[J].公路,2011(6):48-51.
Wang Chunping.Research on control accuracy and factors of asphalt plant[J].Highway,2011(6):48-51.
[2] Hudson S B,Waller H F.Evaluation of construction control procedures:aggregate gradation variations and effects[R]// NCHRP Report.U.S.:Transportation Research Board,1969.
[3] 王旭东.一种基于原材料级配变异性的矿料级配范围的确定方法:中国,201110313054.X[P].2012-06-20.
Wang Xudong.Method for Determining Mineral Aggregate Gradation Range Based on Gradation Variability of Raw Materials:China,201110313054.X[P].2012-06-20.
[4] 沙庆林.重载交通长寿命沥青路面关键技术研究[R].长沙:长沙理工大学,2009:76-77.
Sha Qinglin.Research on Key Technology of Heavy-Load Traffic Long-Life Asphalt Pavement[R].Changsha:Changsha University of Science and Technology,2009:76-77.
[5] Sivileviius H.The influence of the unload mode of asphalt concrete mixing plant hot bin on the homogeneity of screened fractions[J].Transport,2004,19(3):141-147.
[6] Sivileviius H,Vislaviius K.Stochastic simulation of the influence of variation of mineral material grading and dose weight on the homogeneity of hot-mix asphalt[J].Construction and Building Materials,2008,22(9):2007-2014.
[7] Alba F.On-line real-time measurement and control of aggregate gradation in asphalt plants[R]//Nchrp-Idea Program Project Final Report.U.S.:Transportation Research Board,2013.
[8] 李振国,王玉果.沥青拌和站一级回收粉系统改造[J].交通标准化,2010(9):35-38.
Li Zhenguo,Wang Yuguo.Reconstruction of primary dust recovery system in asphalt mixing plant[J].Transport Standardization,2010(9):35-38.
[9] 刘继先.浅谈沥青拌和设备除尘系统与回收粉的利用[J].公路,2002(6):54-55.
Liu Jixian.Discussion on asphalt plant dust removal system and its powder recycling[J].Highway,2002(6):54-55.
[10]王铁庆,杨勇.间歇式沥青混合料搅拌设备振动筛筛网配置研究[J].筑路机械与施工机械化,2005,22(3):15-17.
Wang Tieqing,Yang Yong.Research on configuration of vibrating screen cloth for batch asphalt mixing plant[J].Road Machinery & Construction Mechanization,2005,22(3):15-17.
[11]姚运仕,宋红年,冯忠绪.双频合成振动筛试验[J].中国公路学报,2008,21(4):122-126.
Yao Yunshi,Song Hongnian,Feng Zhongxu.Experiment on double-frequency composed vibrating screen[J].China Journal of Highway and Transport,2008,21(4):122-126.
[12]薛昕,王民,高博,等.复合改性沥青浇筑式混凝土性能研究[J].重庆交通大学学报:自然科学版,2010,29(3):387-390.
Xue Xin,Wang Min,Gao Bo,et al.Study on the performance of compound modified bitumen guss asphalt[J].Journal of Chongqing Jiaotong University:Natural Science,2010,29(3):387-390.
[13]范虎彪,胥志宏.环氧沥青混合料拌和楼生产级配控制技术[J].筑路机械与施工机械化,2009,26(10):44-45.
Fan Hubiao,Xu Zhihong.Gradation control technology of epoxy asphalt mixture mixer plant production[J].Road Machinery & Construction Mechanization,2009,26(10):44-45.
[14]张晨晨,王旭东,黄英强,等.沥青混合料生产配合比均衡设计方法[J].中外公路,2013,33(1):253-255.
Zhang Chenchen,Wang Xudong,Huang Yingqiang,et al.Balanced design method of asphalt mixture job-mix formula[J].Journal of China & Foreign Highway,2013,33(1):253-255.
[15]JT/T 270—2002 强制间歇式沥青混合料搅拌设备[S].北京:人民交通出版社,2002.
JT/T 270—2002 Batch Type Asphalt Mixing Plant[S].Beijing:China Communications Press,2002.
|