[1] 邓文中,代彤.重庆石板坡长江大桥复线桥总体设计[J].桥梁建设,2006(6): 28-32.
DENG Wen-zhong,DAI Tong.Overall design of double-line
bridge of Shibanpo Changjiang River Bridge in Chongqing[J].
Bridge Construction,2006(6): 28-32.
[2] 冯延明.大体积盖梁钢管桁架法施工设计[J].铁道建筑技
术, 2010(8): 11-12.
FENG Yan-ming.The construction design of mass cap beam with
steel tubular truss method[J].Railway Construction Technology,
2010(8): 11-12.
[3] 张瑞霞,魏发保.厦门演武路立交桥上部结构现浇支架设计
[J].桥梁建设,2004(3):31-33.
ZHANG Rui-xia,WEI Fa-bao.Design of cast-in-situ scaffolding
for superstructure of Yanwu road interchange in Xiamen
[J].Bridge Construction,2004(3): 31-33.
[4] 王彦辉.碗扣式满堂支架在现浇混凝土连续箱梁施工中的应
用[J].交通标准化,2010(7): 192-193.
WANG Yan-hui.Application of bowl button full space stent in
continuous box girder construction of cast-in-place concrete
[J].Transport Standardization,2010(7): 192-193.
[5] 彭建萍.赣州章江大桥V 构施工技术[J].世界桥梁,2009
(2): 21-23.
PENG Jian-ping.Construction techniques for v-shaped rigid
frame of Ganzhou Zhangjiang river bridge[J].World Bridges,
2009(2): 21-23.
[6] 邬剑飞,祁彪,葛德书.辽东边墙分离式上部移动支架浇筑连
续箱梁施工方法[J].辽宁省交通高等专科学校学报,2010, 12(3): 4-6.
WU Jian-fei,QI Biao,GE De-shu.Construction method of
movable bracket to cast separate continuous box girder for Liaodong
Bianqiang bridge[J].Journal of Liaoning Provincial College of
Communications,2010,12(3): 4-6.
[7] 方世淮,胡建华.支架平移技术在南昌新八一大桥施工中的应
用[J].重庆交通学院学报,2003,2
2(2): 41-42.
FANG Shi-huai,HU Jian-hua.Application of support translation
method in construction of Nanchang new Bayi bridge[J].
Journal of Chongqing Jiaotong University,2003,2
2(2): 41-42.
[8] 周光强,陈学兵.现浇箱梁非落地式移动支架设计与施工
[J].河港工程, 2000(3): 18-21.
ZHOU Guang-qiang,CHEN Xue-bing.Design and construction
of non-supported movable bracket for cast-in-place box
girder[J].River and Harbor Engineering,2000(3): 18-21. |