重庆交通大学学报(自然科学版) ›› 2004, Vol. 23 ›› Issue (5): 12-15.
• • 上一篇 下一篇
罗红,徐君兰,张永水
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
LUO Hong, XU Jun-lan, ZHANG Yong-shui
Received:
Revised:
Online:
Published:
摘要: 采用支架施工的大跨钢筋砼(RC)拱桥施工中的关键技术问题主要包括主拱圈高度与浇筑的时间确定、主拱 圈分段长度与浇筑程序的确定、主拱圈落架方案的拟定。通过介绍许沟大桥在上述三个方面的工程实践与应用,为 该类桥梁的建设提供借鉴与参考。
关键词: 钢筋砼拱桥, 主拱圈, 支架卸落
Abstract: The key technical problems in construction of long span reinforced concrete arch bridge with scaffold include: layer’s height of main arch, time of pouring concrete , subsection’s length of main arch, procedures of pouring and decentering of main arch etc. This paper provides some references for constructing bridges of this type by a case study of Xugou Bridge.
Key words: reinforced concrete arch bridge, main arch, decentering of scaffold
中图分类号:
U448.22+3
罗红,徐君兰,张永水. 大跨RC拱桥有支架施工中的几个技术问题[J]. 重庆交通大学学报(自然科学版), 2004, 23(5): 12-15.
LUO Hong, XU Jun-lan, ZHANG Yong-shui. Some technical problems in the supervision of long span RC arch bridge construction with scaffold[J]. Journal of Chongqing Jiaotong University(Natural Science), 2004, 23(5): 12-15.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://xbzk.cqjtu.edu.cn/CN/
http://xbzk.cqjtu.edu.cn/CN/Y2004/V23/I5/12