[1]徐伟,李智,张肖宁. 子模型法在大跨径斜拉桥桥面结构分析中的应用[J]. 土木工程学报, 2004, 37(6) : 31-36.
Xu Wei,Li Zhi,Zhang Xiaoning. Application of submodeling method for analysis for deck structure of diagonal cable-stayed bridge with long span [J]. China Civil Engineering Journal,2004,37(6) : 31-36.
[2]李爱群,王浩. 子模型法在超大跨悬索桥钢箱梁应力分析中的应用[J]. 工程力学, 2007,24(2) : 80-84.
Li Aiqun,Wang Hao. Stress analyis on steel box girders of superlong-span suspension bridges with submodel method[J]. Engineering Mechanics,2007, 24(2) : 80-84.
[3]赵大亮,李爱群. 基于子模型法的大跨斜拉桥扁平钢箱梁应力分析[J]. 计算力学学报, 2008,25(3) : 326-330.
Zhao Daliang,Li Aiqun. Stress analysis on steel-box girder of long span cable-stayed bridge based on submodel method[J]. Chinese Journal of Computational Mechanics,2008,25(3) : 326-330.
[4]谢建雄,蔡崇. 基于子模型法的CFST 塔柱变截面区有限元分析[J]. 武汉理工大学学报,2010,32(13) : 62-65.
Xie Jianxiong,Cai Chong. Finite element analysis on non-uniform area of CFST tubular tower based on sub-model method[J]. Journal of Wuhan University of Technology, 2010,32(13) : 62-65.
[5]虞庐松,朱东生. 部分斜拉桥塔梁墩固结点局部应力分析[J].桥梁建设,2008(1) : 54-57.
Yu Lusong,Zhu Dongsheng. Local stress analysis of rigid fixity joint of pylon,girder and pier of an extradoses bridge[J]. Bridge Construction,2008 (1) : 54-57.
[6]黎耀,郑凯锋,陈力波. 大跨矮塔斜拉桥塔墩梁固结部位应力计算分析[J]. 广东公路交通, 2007(3) : 14-17.
Li Yao,Zheng Kaifeng,Chen Libo. Stress analysis of rigid fixity joint of pylon, girder and pier of a long-span and extradosed cablestayed bridge[J]. Guangdong Highway Traffic, 2007(3) : 14-17.
[7]曹海顺,张大伟. 混凝土斜拉桥塔梁临时固结构造分析[J]. 结构工程师, 2007, 23(5) : 19-21.
Cao Haishun,Zhang Dawei. Analysis of temporary fixed construction between tower and girder of concrete cable stayed bridges [J].Structural Engineer,2007, 23(5) : 19-21.
[8]吴美艳,杨光武,郑舟军. 马鞍山长江公路大桥塔梁固结处模型试验研究[J]. 桥梁建设,2011(1) : 13-16.
Wu Meiyan,Yang Guangwu,Zheng Zhoujun. Model test study of rigid fixity of tower and girder of Maanshan Changjiang River Highway Bridge [J]. Bridge Cnstruction,2011(1) : 13-16.
[9]王新忠,周水兴. 坡斜拉桥施工阶段索塔静力分析[J]. 重庆交通大学学报: 自然科学版, 2007,26(4) : 20-24.
Wang Xinzhong,Zhou Shuixing. Static analysis of slope cable stayed bridge tower in construction stage[J]. Journal of Chongqing Jiaotong University: Natural Science, 2007, 26(4) : 20-24.
[10]徐金良,祝兵,陈东. 斜拉桥塔梁固结区应力分析[J]. 四川建筑, 2008,28(4) : 138-140.
Xu Jinliang,Zhu Bing,Chen Dong. Stress analysis of rigid fixity jiont of pylon, girder and pier of a cable-stayed bridge[J]. Sichuan Building, 2008,28(4) : 138-140.
[11]曹忠强. 异型矮塔斜拉桥塔墩梁固结部位应力分析[J]. 交通科技,2010(3) : 41-44.
Cao Zhongqiang. Local stress analysis of rigid fixity joint of pylon,girder and pier of extradosed cable-stayed bridge[J]. Transportation Science and Technology,2010(3) : 41-44.
[12]祝培林. 铁路矮塔斜拉桥墩塔梁固结处详细应力分析[J]. 四川建筑,2011, 31(4) : 160-162.
Zhu Peilin. Local stress analysis of rigid fixity joint of pylon, girder and pier of a railway short tower bridge[J]. Sichuan Building,2011,31(4) :160-162. |