[1]朱永灵,苏权科.知难慎行、如履薄冰——港珠澳大桥主体工程建设理念与实践[J].桥梁,2016,71(3):48-51.
ZHU Yongling, SU Quanke. Taking precautious action with knowledge of difficulty as if walking on thin ice ____Hong Kong-Zhuhai-Macau Bridge main works construction philosophy and practice [J]. Bridge, 2016, 71(3):48-51.
[2]张劲文,朱永灵,高星林,等.港珠澳大桥岛隧工程设计施工总承包模式构建[J].公路,2012,57(1):133-136.
ZHANG Jinwen, ZHU Yong ling, GAO Xinglin, et al. Design-build contracting model development for islands and tunnel engineering of Hong Kong-Zhuhai-Macao Bridge project [J]. Highway, 2012, 57(1): 133-136.
[3]张劲文,朱永灵.港珠澳大桥主体工程建设项目管理规划[J].公路, 2012,57(3):143-147.
ZHANG Jinwen, ZHU Yongling. Project management planning for construction of Hong Kong-Zhuhai-Macao Bridge(HZMB) main bridge project [J]. Highway, 2012, 57(3):143-147.
[4]张鸣功,张劲文,高文博,等.港珠澳大桥钢结构防腐涂装项目管理模式构建[J].公路,2015,60(6):117-121.
ZHANG Minggong, ZHANG Jinwen, GAO Wenbo, et al. Construction of anti-corrosion coating project management model for steel structure of the Hong Kong-Zhuhai-Macao Bridge [J]. Highway,2015,60(6):117- 121.
[5]中交公路规划设计院有限公司联合体.港珠澳大桥初步设计[R].珠海:中交公路规划设计院有限公司,2009.
CCCC Highway Planning and Design Institute Co., LTD. JV. Hong Kong-Zhuhai-Macao Bridge Preliminary Design [R]. Zhuhai: CCCC Highway Planning and Design Institute Co., LTD, 2009.
[6]孟凡超,刘明虎,吴伟胜,等.港珠澳大桥设计理念及桥梁创新技术[J]. 中国工程科学,2015,17(1):27-35.
MENG Fanchao, LIU Minghu, WU Weisheng, et al. The design philosophy and bridge’s technical innovation of Hong Kong-Zhuhai- Macau Bridge [J]. Engineering Sciences, 2015, 17(1): 27-35.
[7]刘晓东.港珠澳大桥总体设计与技术挑战[C]//第十五届中国海洋(岸)工程学术讨论会论文集.太原:中国海洋,2011:17-20.
LIU Xiaodong. The Overall Design and Technical Challenges of the Hong Kong-Zhuhai-Macao Bridge[C]//The 15th China Ocean (Shore) Proceedings of the International Symposium. Taiyuan: China Ocean, 2011: 17-20.
[8]中交联合体港珠澳大桥岛隧工程项目总经理部.港珠澳大桥岛隧工程施工图设计[R]. 珠海:中交公路规划设计院有限公司,2016.
General Management Office of CCCC JV for the Island and Tunnel Works of Hong Kong-Zhuhai-Macao Bridge. The detailed design of the island and tunnel works of Hong Kong-Zhuhai-Macao Bridge[R].Zhuhai: CCCC Highway Planning and Design Institute Co., LTD,2016.
[9]李英,陈越.港珠澳大桥岛隧工程的意义及技术难点[J].工程力学, 2011,28(增刊2):67-77.
LI Ying, CHEN Yue. The importance and technical difficulties of tunnel and islands for Hong Kong-Zhuhai-Macao Bridge project [J]. Engineering Mechanics, 2011, 28(Sup 2): 67-77.
[10]中交公路规划设计院有限公司设计联合体.港珠澳大桥主体工程桥梁DB01标段施工图设计[R].珠海:中交公路规划设计院有限公司,2012.
CCCC Highway Planning and Design Institute Co., LTD. JV. The Detailed Design for Bridge DB01 Contract of Hong Kong- Zhuhai-Macao Bridge Main Works [R].Zhuhai: CCCC Highway Planning and Design Institute Co., LTD, 2012.
[11]中铁大桥勘察设计院有限公司设计联合体.港珠澳大桥主体工程桥梁DB02标段施工图设计[R].珠海:中铁大桥勘测设计院有限公司,2012.
China Railway Bridge Survey and Design institute Co., LTD. Design JV. The Detailed Design of Bridge DB02 Contract of Hong Kong- Zhuhai-Macao Bridge Main Works [R]. Zhuhai: China Railway Bridge Survey and Design institute Co., LTD, 2012.
[12]陈儒发,刘刚亮,王忠文,等.外海埋置式全预制桥梁墩台安装止水关键技术[J].公路, 2015,60(10): 94 - 99.
CHEN Rufa, LIU Gangliang, WANG Zhongwen, et al. Key technology of water-stop device installation for embedded prefabricated pile cap on open sea [J]. Highway, 2015,60(10): 94-99.
[13]中铁山桥集团有限公司.港珠澳大桥桥梁CB01标段施工组织设计[R]. 珠海:中铁山桥集团有限公司,2012.
China Railway Mountain Bridge Group CO., LTD. The Construction Organization Design Under Bridge CB01 Contract of Hong Kong-Zhuhai-Macao Bridge Project [R].Zhuhai: China Railway Mountain Bridge Group CO., LTD, 2012.
[14]方明山.这些年,那些事[J].港珠澳大桥,2015,24(1):32-36.
FANG Mingshan. These years, those things [J]. Hong Kong-Zhuhai- Macau Bridge, 2015, 24(1):32-36.
[15]邝青梅,杨东来.港珠澳大桥桥面铺装用集料加工成套技术[J].公路, 2016,61(5):182-187.
KUANG Qingmei, YANG Donglai. Complete set of processing technology for bridge deck pavement of Hong Kong-Zhuhai-Macao Bridge [J]. Highway, 2016, 61(5): 182-187. |