[1] 王云莉,刘洋,张绪进,等.白石窑水利枢纽通航建筑物整体定床及防洪模型试验研究报告[R].重庆:重庆西南水运工程科学研究所,2012.
Wang Yunli, Liu Yang, Zhang Xujin. Report on Experience of Fixed Bed and Flood Model of Baishiyao Hydraulic Project [R]. Chongqing: The Southwest Waterway Engineering Institute, 2012.
[2] JTJ 305—2001船闸总体设计规范[S]. 北京:人民交通出版社,2001.
JTJ 305—2001 Code for Master Design of Shiplocks [S]. Beijing: China Communications Press, 2001.
[3] JTJ 312—2003 航道整治工程技术规范[S]. 北京:人民交通出版社,2003.
JTJ 312—2003 Technical Code of Regulation Works for Navigation Channel [S]. Beijing: China Communications Press, 2003.
[4] 赵志洲,徐红,彭凯.乌江银盘电站下游引航道布置及口门区通航条件研究[J].水运工程,2008(3):82-86.
Zhao Zhizhou, Xu Hong, Peng Kai. On arrangement of downstream approach channel and navigation condition in the entrance area of Yinpan power station on the Wujiang River [J]. Port and Waterway Engineering, 2008(3): 82-86.
[5] 赵健.富金坝枢纽船闸引航道布置及通航条件研究[D].重庆:重庆交通大学,2009.
Zhao Jian. Research on Layout for the Approach Channel of Ship Lock and Navigation Conditions in Fujinba Junction [D]. Chongqing: Chongqing Jiaotong University, 2009.
[6] 谭先泽,郝岭,吴文凤.山区河流船闸引航道布置型式[J].水运工程,2006(4):69-72.
Tan Xianze, Hao Ling, Wu Wenfeng. Arrangement of ship lock approach channel in mountainous rivers [J]. Port and Waterway Engineering, 2006(4): 69-72.
[7] 黄碧珊,张绪进,舒荣龙,等.新政电航枢纽船闸引航道口门区通航条件研究[J].重庆交通学院学报,2003,22(3):120-124.
Huang Bishan, Zhang Xujin, Shu Ronglong, et al. Study on the flow conditions at the entrance area of shiplock approach channel in hydro-power station [J]. Journal of Chongqing Jiaotong University, 2003, 22(3):120-124.
[8] 李焱,郑宝友,卢文蕾,等.引航道与河流主航道的夹角对通航条件影响试验[J]. 水道港口, 2009,30(1):42-48.
Li Yan, Zheng Baoyou, Lu Wenlei, et al. Test on navigation condition influenced by the angle between approach channel and main channel [J]. Journal of Waterway and Harbor, 2009, 30(1): 42-48.
|