[1] 韦成龙,曾庆元,刘小燕.板桁结合梁剪滞效应分析的有限段法[J].桥梁建设,2000(3):11-13.
WEI Chenglong, ZENG Qingyuan, LIU Xiaoyan. Finite segment method for analysis of shear lag effect in plate and truss composite girder[J]. Bridge Construction, 2000(3): 11-13.
[2] 陈勉.考虑剪力滞效应的钢-混凝土结合梁位移闭合解[J].重庆交通大学学报(自然科学版),2011,30(4):717-720.
CHEN Mian. Closed solutions of composite steel-concrete beams displacement considering shear lag effect[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(4): 717-720.
[3] 苏庆田,吴冲,董冰.斜拉桥扁平钢箱梁的有限混合单元法分析[J].同济大学学报(自然科学版),2005,33(6):742-746.
SU Qingtian, WU Chong, DONG Bing. Analysis of flat steel-box-girder of cable-stayed bridge by finite mixed element method[J]. Journal of Tongji University(Natural Science), 2005, 33(6):742-746.
[4] 陈红,谢军,黄成造.大跨度扁平钢箱梁斜拉桥主梁横隔板局部应力分析[J].重庆交通大学学报(自然科学版),2008,27(4):508-511.
CHEN Hong, XIE Jun, HUANG Chengzao. Local stress analysis in diaphragm of the long-span cable-stayed bridge with flat steel box-girder[J]. Journal of Chongqing Jiaotong University(Natural Science), 2008, 27(4): 508-511.
[5] YAMAGUCHI E, CHAISOMPHOB T, SA-NGUANMANASAK J, et al. Stress concentration and deflection of simply supported box girder including shear lag effect[J]. Structural Engineering & Mechanics, 2008, 28(2): 207-220.
[6] SA-NGUANMANASAK J, CHAISOMPHOB T, YAMAGUCHI E. Stress concentration due to shear lag in continuous box girders[J]. Structural Engineering & Mechanics, 2007, 29(7): 1414-1421.
[7] 孙淑红,顾安邦,张雪松.外倾式部分斜拉桥重庆嘉悦大桥锚固结构试验及受力分析[J].重庆交通大学学报(自然科学版),2011,30(增刊2):1252-1255.
SUN Shuhong, GU Anbang, ZHANG Xuesong. Cable girder anchorage experiment and stress analysis of extra-dosed cable-stayed bridge[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(Sup 2): 1252-1255.
[8] 杨霞林,孙学先,吴亚平.斜拉桥箱形主梁直腹板的合理厚度分析[J].铁道学报,2009,31(2):132-136.
YANG Xialin, SUN Xuexian, WU Yaping. Analysis of reasonable thickness of vertical web of main girder in cable-stayed bridge[J]. Journal of the China Railway Society, 2009, 31(2): 132-136.
[9] 罗许国,戴公连.三主桁斜拉桥桥面板剪力滞效应研究[J].西安建筑科技大学学报(自然科学版),2008,40(3):297-301.
LUO Xuguo, DAI Gonglian. Shear lag effect research of slab in three-truss cable-stayed bridge[J]. Journal of Xi'an University of Architecture and Technology(Natural Science Edition), 2008, 40(3): 297-301.
[10] 张玉平,李传习.顶板、底板和斜腹板厚度对斜拉桥箱梁剪力滞效应的影响[J].长沙交通学院学报,2008,24(2):23-28.
ZHANG Yuping, LI Chuanxi. Influence of top flange, bottom flange and web thickness on the shear lag effect of box girder used in cable-stayed bridge[J]. Journal of Changsha Communications University, 2008, 24(2): 23-28.
[11] KUNDALWAL S I, RAY M C. Shear lag analysis of a novel short fuzzy fiber-reinforced composite[J]. Acta Mechanica, 2014, 225(9): 2621-2643.
[12] GARA F, RANZI G, LEONI G. Short-and long-term analytical solutions for composite beams with partial interaction and shear-lag effects[J]. International Journal of Steel Structures, 2010, 10(4): 359-372.
[13] ZHOU Wangbao, JIANG Lizhong, YU Zhiwu. Analysis of free vibration characteristic of steel-concrete composite box-girder considering shear lag and slip[J]. Journal of Central South University, 2013, 20(9): 2570-2577. |