中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

重庆交通大学学报(自然科学版) ›› 2020, Vol. 39 ›› Issue (02): 43-49.DOI: 10.3969/j.issn.1674-0696.2020.02.07

• 交通运输工程 • 上一篇    下一篇

新型动卧列车开行与4小时综合维修天窗设置研究

张雷1,熊剑春1,汤轶雄2,占曙光2,3,彭其渊2,3   

  1. (1. 中车唐山机车车辆有限公司,河北 唐山 063000; 2. 西南交通大学 交通运输与物流学院,四川 成都 610031; 3. 西南交通大学 综合交通运输智能化国家地方联合工程实验室,四川 成都 610031)
  • 收稿日期:2018-06-29 修回日期:2018-11-30 出版日期:2020-02-20 发布日期:2020-02-20
  • 作者简介:张雷(1975—),男,江苏徐州人,正高级工程师,主要从事轨道车辆总体设计方面的研究。E-mail:sjc-zhanglei@tangche.com。 通信作者:占曙光(1986—),男,湖北黄冈人,博士,主要从事列车运行调整方面的研究。E-mail:shuguangzhan@my.swjtu.edu.cn。
  • 基金资助:
    国家自然科学基金项目(71701174);中央高校基本科研业务费专项基金项目(2682017CX020); 中车唐山机车车辆有限公司项目 (2017504680)

Operation of New High-Speed Sleeper EMU Train and Setting of 4-Hour Comprehensive Maintenance Window

ZHANG Lei1, XIONG Jianchun1, TANG Yixiong2, ZHAN Shuguang2,3, PENG Qiyuan2,3   

  1. (1. CRRC Tangshan Co., Ltd., Tangshan 063000, Hebei, China; 2. School of Transportation & Logistics, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 3. National and Local Joint Engineering Laboratory of Integrated Transportation Intelligence, Southwest Jiaotong University, Chengdu 610031, Sichuan, China)
  • Received:2018-06-29 Revised:2018-11-30 Online:2020-02-20 Published:2020-02-20

摘要: 针对高速铁路夜间列车运行与综合维修天窗间严重冲突制约夜间列车开行数量和综合维修质量的问题,笔者采用线性整数规划的方法,以动卧列车总旅行时间最小化为目标,构建了列车运行图与综合维修天窗一体化优化线性规划模型,使用CPLEX求解器进行求解,结果显示以现有的京广高铁列车运行图为基础,能够求解出新型动卧列车适应于4小时综合维修天窗开设的列车运行图与天窗设置协调方案。研究结果表明新型动卧列车开行夜间列车后能保证京广高铁每个区间均能开4小时的综合维修天窗, 满足每日开行的综合维修质量要求。

关键词: 交通工程, 高速铁路, 综合维修天窗, 夜间动卧车

Abstract: In view of the serious conflict between night train operation and comprehensive maintenance window of high-speed railway, which severely restricted the number of night train operation and comprehensive maintenance quality, a linear programming model for the integration of train diagram and comprehensive maintenance window was established, with the goal of minimizing the total travel time of high-speed sleeper EMU train. The model was solved by CPLEX, and the coordination scheme between the train diagram and comprehensive maintenance window setting of the new high-speed sleeper EMU train suitable for the opening of 4-hour comprehensive maintenance window was solved, which was based on the existing train diagram of Beijing-Guangzhou high-speed railway. The results show that the new high-speed sleeper EMU train can ensure that the comprehensive maintenance window can be opened for 4 hours in each section of Beijing-Guangzhou high-speed railway after running night train, and meet the requirements of comprehensive maintenance quality for daily operation.

Key words: traffic engineering, high-speed railway, comprehensive maintenance window, high-speed sleeper EMU train

中图分类号: