|
|
PBA车站扣拱施工顺序对上部跨河桥沉降影响分析 |
曹力桥1,王志斌2,周丁恒3 |
(1. 中铁第四勘察设计院集团有限公司,湖北 武汉 430063; 2. 杭州萧冠交通工程有限公司,浙江 杭州 311215; 3. 中铁第五勘察设计院集团有限公司,北京 102600) |
|
Influence Analysis of Buckle-Arch Construction Sequence of PBA Station on the Settlement of Upper River-Crossing Bridge |
CAO Liqiao1, WANG Zhibin2, ZHOU Dingheng3 |
(1. China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063, Hubei, China; 2. Hangzhou Xiaoguan Traffic Engineering Co., Ltd., Hangzhou 311215, Zhejiang, China; 3. China Railway Fifth Survey and Design Institute Group Co., Ltd., Beijing 102600, China) |
|