[1] MONACO M F, SAMMARRA M. The ship stowage planning problem[C]∥Proceeding of 10 th International Workshop on Harbor Maritime Multimodal Logistics Modeling & Simulation. Amantea, Italy: Diptim-University Genoa, 2008: 208-213.
[2] MONACO M F, SAMMARRA M, SORRENTINO G. The terminal-oriented ship stowage planning problem[J]. European Journal of Operational Research, 2014, 239(1): 256-265.
[3] ARAUJO E J, CHAVES A A, NETO L L D, et al. Pareto clustering search applied for 3D container ship loading plan problem[J]. Expert Systems with Applications, 2016, 44: 50-57.
[4] BILICAN M S, EVREN R, KARATAS M. A mathematical model and two-stage heuristic for the container stowage planning problem with stability parameters[J].Ieee Access,2020, 8: 113392-113413.
[5] ZHANG Zizhen, LEE Chung-yee. Multiobjective approaches for the ship stowage planning problem considering ship stability and container rehandles[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2016, 46(10): 1374-1389.
[6] PARREO F, PACINO D, ALVAREZ-VALDES R. A GRASP algorithm for the container stowage slot planning problem[J]. Transpor-tation Research Part E: Logistics and Transportation Review, 2016, 94: 141-157.
[7] ZHAO Ning, GUO Yuechao, XIANG Tianyu, et al. Container ship stowage based on Monte Carlo tree search[J]. Journal of Coastal Research, 2018, 83(1): 540-547.
[8] SHEN Y F, ZHAO N, Xia M J, et al. Adeep Q-learning network for ship stowage planning problem[J]. Polish Maritime Research, 2017, 24: 102-109.
[9] 范厚明,孔靓,岳丽君.考虑出口箱进出场及预翻箱的箱位分配与场桥调度协同优化[J].运筹与管理,2021,30(6):26-34.
FAN Houming, KONG Liang, YUE Lijun. Yard crane scheduling and storage space allocation considering container storage, retrieval, and pre-marshalling[J]. Operations Research and Management Science, 2021, 30(6): 26-34.
[10] 丁一,龚杰,林国龙.考虑箱区作业均衡的ACT船舶配载研究[J].计算机应用与软件,2018,35(9):7-15.
DING Yi, GONG Jie, LIN Guolong. Research on the ship stowage planning problem with yard blocks balance constraints in ACT[J]. Computer Applications and Software, 2018, 35(9): 7-15.
[11] 丁一,田亮,龚杰.考虑箱区作业均衡的ACT船舶配载鲁棒优化研究[J].计算机工程与应用,2020,56(13):262-272.
DING Yi, TIAN Liang, GONG Jie. Robust optimization of ship stowage planning problem in ACT considering balance of block operation[J]. Computer Engineering and Applications, 2020, 56(13): 262-272.
[12] 刘志雄,钱翰文,颜家岚.集装箱码头船舶多贝位配载与堆场取箱协同优化研究[J].系统仿真学报,2021,33(7):1689-1698.
LIU Zhixiong, QIAN Hanwen, YAN Jialan. Collaborative optimization of ship stowage plan and yard container unloading for container terminal[J]. Journal of System Simulation, 2021, 33(7): 1689-1698.
[13] SHEN Yifan, ZHAO Ning, MI Weijuan. Group-bay stowage planning problem for container ship[J]. Polish Maritime Research, 2016, 23: 152-159.
[14] 郭文文,计明军,祝慧灵,等.集装箱码头装船顺序和场桥行驶路径联合优化[J].交通运输系统工程与信息,2018,18(4):178-187.
GUO Wenwen, JI Mingjun, ZHU Huiling, et al. Joint optimization of loading sequence and yard crane travel route in container terminals[J]. Journal of Transportation Systems Engineering and Information Technology, 2018, 18(4): 178-187.
[15] 郭文文,计明军,祝慧灵,等.集装箱码头场桥调度优化模型研究[J].重庆交通大学学报(自然科学版),2021,40(6):66-72.
GUO Wenwen, JI Mingjun, ZHU Huiling, et al. Optimization model of yard crane scheduling in a container terminal[J]. Journal of Chong-qing Jiaotong University (Natural Science), 2021, 40(6): 66-72.
[16] YANG Chunxia, WANG Xiaojun, LI Zhenfeng. An optimization approach for coupling problem of berth allocation and quay crane assign-ment in container terminal[J]. Computers & Industrial Engineering, 2012, 63(1): 243-253. |