[1] 彭其渊,杨奎,文超,等.我国高速铁路夜间行车组织方法[J].西南交通大学学报,2015,50(4):569-576.
PENG Qiyuan, YANG Kui, WEN Chao, et al.Organization methods of overnight operation for Chinese high-speed railways [J].Journal of Southwest Jiaotong University, 2015, 50(4): 569-576.
[2] 朱绪斐.我国高速铁路夜间行车方法[J].交通运输工程与信息学报,2019,17(2):98-105,114.
ZHU Xufei.Overnight operation methods for Chinese high-speed railways [J].Journal of Transportation Engineering and Information, 2019, 17(2): 98-105, 114.
[3] 吴嘉,史海欧. 城市轨道交通夜间延时运营的探讨[J]. 都市快轨交通,2019,32(3):145-151.
WU Jia, SHI Haiou.Study on operation extension at night for urban rail transit [J].Urban Rapid Rail Transit, 2019, 32(3): 145-151.
[4] 陈虹兵. 城市轨道交通通宵运营模式实践研究——以广州地铁为例[J]. 交通世界,2019(23):33-36.
CHEN Hongbing.Practical research on the overnight operation mode of urban rail transit: Taking Guangzhou metro as an example [J].TranspoWorld, 2019(23): 33-36.
[5] 史丰收,刘劲,陈哲. 城市轨道交通通宵运营研究[J]. 都市快轨交通,2020,33(2):146-151.
SHI Fengshou, LIU Jin, CHEN Zhe.Urban rail transit overnight operation [J]. Urban Rapid Rail Transit, 2020, 33(2): 146-151.
[6] 赵源,丁小兵,徐行方.快慢车模式下城市轨道交通线路通过能力分析与计算方法[J]. 城市轨道交通研究,2018,21(10):16-20.
ZHAO Yuan, DING Xiaobing, XU Xingfang.Analysis and calculation of metro carrying capacity in express and local train mode [J].Urban Mass Transit, 2018, 21(10): 16-20.
[7] 王晓潮,周鲁,金华,等. 城市轨道交通快慢车方案线路通过能力研究[J]. 重庆交通大学学报(自然科学版),2021,40(3):56-63.
WANG Xiaochao, ZHOU Lu, JIN Hua, et al.Line carrying capacity of urban rail transit fast and slow train scheme [J].Journal of Chongqing Jiaotong University (Natural Science), 2021, 40 (3): 56-63.
[8] 魏玉光,夏阳,赖艺欢. 城市轨道交通线路通过能力计算方法研究[J]. 中国铁道科学,2018,39(2):112-118.
WEI Yuguang, XIA Yang, LAI Yihuan.Research on calculation method of line carrying capacity for urban rail transit [J].China Railway Science, 2018, 39(2): 112-118.
[9] DINGLER M H, LAI Yungcheng, BARKAN C P L.Effect of train-type heterogeneity on single-track heavy haul railway line capacity [J].Proceedings of the Institution of Mechanical Engineers: Part F, 2014, 228(8): 845-856.
[10] ATANASSOV I, Dick C T.Capacity of single-track railway lines with short sidings to support operation of long freight trains [J].Transportation Research Record, 2015, 2538(2475): 95-101.
[11] DICK C T, MUSSANOV D.Operational schedule flexibility and infrastructure investment capacity trade-off on single-track railways [J].Transportation Research Record, 2016, 2602(2546): 1-8.
[12] SHIH M C,LAI Yungcheng, DICK C T, et al.Optimization of siding location for single-track lines [J].Transportation Research Record, 2014, 2470(2448): 71-79.
[13] JAMILI A.Computation of practical capacity in single-track railway lines based on computing the minimum buffer times [J].Journal of Rail Transport Planning & Management, 2018, 8(2): 91-102.
[14] 严余松. 单线铁路平行运行图区间通过能力的整数规划法[J]. 西南交通大学学报,1994,29(1):97-101.
YAN Yusong.Integer programming method for calculating the carrying capacity of parallel train working graph on single-track lines [J].Journal of Southwest Jiaotong University, 1994, 29(1): 97-101.
[15] 严余松. 单线铁路平行运行图通过能力的遗传算法[J]. 西南交通大学学报,2000,35(3):277-279.
YAN Yusong.The genetic algorithms for the carrying capacity of parallel train working graph on single railway lines [J].Journal of Southwest Jiaotong University, 2000, 35(3): 277-279.
[16] LI Feng, GAO Ziyou, WANG D Z W, et al.A subjective capacity evaluation model for single-track railway system with delta-balanced traffic and lambda-tolerance level [J].Transportation Research Part B-Methodological, 2017, 105: 43-66.
[17] 郑亚晶,张星臣,陈军华,等. 单线铁路成对非追踪平行运行图最小周期时间的混合整数非线性规划模型[J]. 中国铁道科学,2012,33(2):100-106.
ZHENG Yajing, ZHANG Xingchen, CHEN Junhua, et al.The mixed integer nonlinear programming model for the minimum cycle time of a parallel train working graph without tracking operation on single-track railway [J].China Railway Science, 2012, 33(2): 100-106.
[18] 赵鹏,童有超,张进川,等. 单线铁路成对追踪平行运行图通过能力计算方法研究[J]. 铁道学报,2020,42(12):1-9.
ZHAO Peng, TONG Youchao, ZHANG Jinchuan, et al.Research on method on calculating carrying capacity of parallel train working graph with tracking operation on single-track railway [J].Journal of the China Railway Society, 2020, 42(12): 1-9. |