[1] EL-SABEK L M, MCCABE B Y. Coordination challenges of production planning in the construction of international mega-projects in the Middle East[J]. International Journal of Construction Education and Research, 2018, 14(2): 118-140.
[2] TANG Pingbo, HUBER D, AKINCI B, et al. Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques[J]. Automation in Construction, 2010, 19(7): 829-843.
[3] KIM S, KIM S, LEE D E. Sustainable application of hybrid point cloud and BIM method for tracking construction progress[J]. Sustainability, 2020, 12(10): 4106.
[4] LO Y, ZHANG Cheng, YE Zehao, et al. Monitoring road base course construction progress by photogrammetry-based 3D reconstruction[J]. International Journal of Construction Management, 2023, 23(12): 2087-2101.
[5] CHENG Tao, MANTRIPRAGADA U, TEIZER J, et al. Automated trajectory and path planning analysis based on ultra wideband data[J]. Journal of Computing in Civil Engineering, 2012, 26(2): 151-160.
[6] WOO S, JEONG S, MOK E, et al. Application of WiFi-based indoor positioning system for labor tracking at construction sites: a case study in Guangzhou MTR[J]. Automation in Construction, 2011, 20(1): 3-13.
[7] ELQASABY A R, ALQAHTANI F K, ALHEYF M. State of the art of BIM integration with sensing technologies in construction progress monitoring[J]. Sensors, 2022, 22(9): 3497.
[8] BEHNAM A, WICKRAMASINGHE D C, GHAFFAR M A A, et al. Automated progress monitoring system for linear infrastructure projects using satellite remote sensing[J]. Automation in Construction, 2016, 68: 114-127.
[9] FURLANI K M, PFEFFER L E. Automated tracking of structural steel members at the construction site[C]//Proceedings of the 17th International Symposium on Automation and Robotics in Construction (ISARC). International Association for Automation and Robotics in Construction (IAARC), 2000: 1201-1206.
[10] CHIN S, YOON S, CHOI C, et al. RFID+4D CAD for progress management of structural steel works in high-rise buildings[J]. Journal of Computing in Civil Engineering, 2008, 22(2): 74-89.
[11] CHENG T, VENUGOPAL M, TEIZER J, et al. Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments[J]. Automation in Construction, 2011, 20(8): 1173-1184.
[12] TEIZER J, LAO D, SOFER M. Rapid automated monitoring of construction site activities using ultra-wide band[C]// Proceedings of the 24th International Symposium on Automation and Robotics in Construction(ISARC). International Association for Automation and Robotics in Construction (IAARC), 2007: 19-21.
[13] TUTTAS S, BRAUN A, BORRMANN A, et al. Acquisition and consecutive registration of photogrammetric point clouds for construction progress monitoring using a 4DBIM[J]. PFG – Journal of Photogrammetry, Remote Sensing and Geoinformation Science, 2017, 85(1): 3-15.
[14] BOGNOT J R, CANDIDO C G, BLANCO A C, et al. Building construction progress monitoring using unmanned aerial system (UAS), low-cost photogrammetry, and geographic information system (GIS)[J]. ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 2018, 4: 41-47.
[15] 李行义, 李海云, 姚萌萌, 等. 基于无人机可见光影像的杆塔施工自动化进度检测技术[J]. 测绘通报, 2021(增刊2): 47-51.
LI Xingyi, LI Haiyun, YAO Mengmeng, et al. Construction progress monitoring based on the integration of indoor 3D point cloud and BIM [J]. Bulletin of Surveying and Mapping, 2021(Sup 2): 47-51.
[16] 朱凌, 孙伟伦, 周克勤. 无人机倾斜摄影进行建筑施工进展监测初探[J]. 遥感信息, 2021, 36(4): 12-19.
ZHU Ling, SUN Weilun, ZHOU Keqin. Building construction progress monitoring based on oblique photography[J]. Remote Sensing Information, 2021, 36(4): 12-19.
[17] PURI N, TURKAN Y. Bridge construction progress monitoring using lidar and 4D design models[J]. Automation in Construction, 2020, 109: 102961.
[18] WESTOBY M J, BRASINGTON J, GLASSER N F, et al. ‘Structure-from-Motion photogrammetry: A low-cost, effective tool for geoscience applications[J]. Geomorphology, 2012, 179: 300-314.
[19] DUQUE L, SEO J, WACKER J. Synthesis of unmanned aerial vehicle applications for infrastructures[J]. Journal of Performance of Constructed Facilities, 2018, 32(4): 0001185.
[20] HAN K, DEGOL J, GOLPARVAR-FARD M. Geometry and appearance-based reasoning of construction progress monitoring[J]. Journal of Construction Engineering and Management, 2018, 144(2): 04017110.
[21] MESSINGER M, SILMAN M. Unmanned aerial vehicles for the assessment and monitoring of environmental contamination: An example from coal ash spills[J]. Environmental Pollution, 2016, 218: 889-894.
[22] LOWE D G. Distinctive image features from scale-invariant keypoints[J]. International Journal of Computer Vision, 2004, 60(2): 91-110.
[23] MASOOD M K, AIKALA A, SEPPNEN O, et al. Multi-building extraction and alignment for as-built point clouds: A case study with crane cameras[J]. Frontiers in Built Environment, 2020, 6: 581295.
[24] BOSCH F. Automated recognition of 3D CAD model objects in laser scans and calculation of as-built dimensions for dimensional compliance control in construction[J]. Advanced Engineering Informatics, 2010, 24(1): 107-118.
[25] RUSINKIEWICZ S, LEVOY M. Efficient variants of the ICP algorithm[C]//Proceedings Third International Conference on 3D Digital Imaging and Modeling. IEEE, 2002: 145-152. |