[1] 周水兴, 江礼忠, 曾忠.拱桥节段施工斜拉扣挂索力仿真计算研究[J].重庆交通学院学报, 2000,19(3):8-12.
ZHOU Shuixing, JIANG Lizhong, ZENG Zhong. Simulation calculation study of cable-stayed force for arch bridge segmental construction[J]. Journal of Chongqing Jiaotong Institute, 2000,19(3):8-12.
[2] 周汉东,许晓峰,黄福伟.大跨径钢管混凝土拱桥钢管拱肋吊装施工控制[J].哈尔滨建筑大学学报,1997,28(增刊1):87-92.
ZHOU Handong, XU Xiaofeng, HUANG Fuwei. Lifting construction control of steel tube arch rib of long-span concrete-filled steel tube arch bridge[J]. Journal of Harbin University of Architecture Supplement,1997, 28(Sup1):87-92.
[3] 田仲初, 陈得良, 颜东煌,等.大跨度拱桥拱圈拼装过程中扣索索力和标高预抬量的确定[J].铁道学报, 2004, 26(3):81-87.
TIAN Zhongchu, CHEN Deliang, YAN Donghuang, et al. Determination of the buckling cable-force and precamber in the process of assembling arch ring segments of a long-span arch bridge[J]. Journal of the China Railway Society, 2004, 26(3):81-87.
[4] 周银, 张雪松, 丁艳超. 无应力状态法在大跨径拱桥施工中的应用[J]. 重庆交通大学学报(自然科学版), 2018, 37(8):6-10.
ZHOU Yin, ZHANG Xuesong, DING Yanchao. Application of stress-free state method in long-span arch bridge construction[J]. Journal of Chongqing Jiaotong University (Natural Science), 2018, 37(8):6-10.
[5] 周水兴,蔡净. 定长扣索法安装拱桁架节段控制索力计算[J]. 工程力学, 2001, 28(增刊1):838-842.
ZHOU Shuixing, CAI Jin. Calculation of segment control cable force for arch truss installation by fixed-length fastening cable method[J]. Engineering Mechanics Supplement, 2001, 28(Sup 1): 838-842.
[6] 张治成, 叶贵如, 陈衡治. 大跨度钢管砼拱桥拱肋吊装中的扣索索力计算[J]. 浙江大学学报(工学版), 2004, 38(5):610-614.
ZHANG Zhicheng, YE Guiru, CHEN Hengzhi. Calculation of stayed-buckle cable forces for concrete-filled steel tubular arch bridge with long span in process of lifting[J]. Journal of Zhejiang University (Engineering Science), 2004, 38(5):610-614.
[7] 秦顺全. 无应力状态控制法——斜拉桥安装计算的应用[J]. 桥梁建设, 2008,(2):13-16.
QIN Shunquan. Application of unstressed state control method to calculation for erection of cable-stayed bridge[J]. Bridge Construction, 2008,(2):13-16.
[8] 张万晓, 杨昌龙, 周水兴, 等. 基于无应力状态法的拱桥悬臂施工控制方法研究[C]∥ 第二十一届全国桥梁学术会议论文集(上册).北京:人民交通出版社股份有限公司, 2014:785-789.
ZHANG Wanxiao, YANG Changlong, ZHOU Shuixing, et al. Research on cantilever construction control method of arch bridge based on stress-free state method[C]∥ Proceedings of Twenty-first National Bridge Academic Conference (Volume I). Beijing: China Communication Press Co., Ltd., 2014: 785-789.
[9] 田维锋, 周水兴, 秦镇. 基于无应力状态法的零杆虚位移修正[J]. 重庆交通大学学报(自然科学版), 2010, 29(1):20-22.
TIAN Weifeng, ZHOU Shuixing, QIN Zhen. Modification of virtual displacement based on unstressed state method[J]. Journal of Chongqing Jiaotong University (Natural Science), 2010, 29(1):20-22.
[10] 韩玉, 秦大燕, 郑健. CFST拱桥斜拉扣挂施工优化计算方法[J]. 公路, 2018(1):100-104.
HAN Yu, QIN Dayan, ZHENG Jian. Optimization calculation method of cable-stayed suspension of CFST arch bridge[J]. Highway, 2018 (1):100-104.
[11] 周琳淇,周水兴,孟云. ANSYS中准确施加和计算索力的方法[C]∥第二十三届全国桥梁学术会议论文集(下册).北京:人民交通出版社股份有限公司,2018:556-560.
ZHOU Linqi, ZHOU Shuixing, MENG Yun. A method of accurately applying and calculating cable forces in ANSYS[C]∥Proceedings of Twenty-Third National Bridge Academic Conference (Volume II). Beijing: China Communication Press Co., Ltd., 2018:556-560. |