[1]张仁.三峡水库的泥沙问题[J].水力发电,2009,35(12):10-11. ZHANG Ren.Sediment problems of Three Reservoir Gorges[J].Water Power,2009,35(12):10-11.
[2]水利电力部科学技术司.三峡工程泥沙问题研究成果汇编[C].北京:水利电力出版社,1988:99-114.
[3]杨胜发,方铎.三峡水库变动回水区河道推移质输移特性研究[J].水利水电技术,2003,35(2):5-8. YANG Sheng-fa,FANG Duo.Study on bed load in the backwaterchang-area of Three Gorges Reservoir[J].Water Resources andHydropower Engineering,2003,35(2):5-8.
[4]程昌华,郑银功.三峡工程变动回水区观音滩河段河工模型试验究[J].重庆交通学院学报,1998,17(1):11-17. CHENG Chang-hua,ZHENG Yin-gong.The model test researchon Guanyintan reach in the variable backwater zone of the ThreeGorges Project[J].Journal of Chongqing Jiaotong University,1998,17(1):11-17.
[5]陈建,李义天,孙东坡,等.水库调度方式对三峡水库泥沙淤积的影响[J].武汉大学学报:工学版,2008,41(5):18-22. CHEN Jian,LI Yi-tian,SUN Dong-po,et al.Impact of operationregulation on sedimentation of Three Gorges Reservoir[J].Journalof Wuhan University:Engineering Science,2008,41(5):18-22.
[6]韩其为.三峡水库泥沙计算成果是可靠的:对“关于三峡水库泥沙计算可靠性的讨论"文章的回应和讨论[J].水力发电学报,2006,25(6):91-102. HAN Qi-wei.Reliability of soil sediment computation in feasibilitystudies of TGR:response on“discussion on the reliability of sedi-ment computations employed in the feasibility studies of Three Gor-ges Project”[J].Journal of Hydroelectric Engineering,2006,25(6):91-102.
[7]金中武,范北林,徐海涛.三峡水库变动回水区泥沙问题研究[J].水利水电技术,2009,40(5):14-18. JIN Zhong-wu,FAN Bei-lin,XU Hai-tao.Study on sedimentatonfluctuation area of Three Gorges Reservoir[J].Water Resourcesand Hydropower Engineering,2009,40(5):14-18.
[8]谢葆玲,陈立.三峡工程蓄水位与长江航道[J].中国三峡建设杂志,2005(5):56-60. XIE Bao-lin,CHEN Li.Impoundment of Three Gorges Reservoirand waterways of the Yangtze River[J].China Three Gorges Con-struction,2005(5):56-60.
|