[1] 邓敏.超载对沥青混凝土路面破坏机理及经济损失评价[J].重庆交通学院学报,2006,25(6):58-59.
DENG Min.Mechanism of overload on asphalt concrete pavement damage and economic loss evaluation [J].Journal of Chongqing Jiaotong University,2006,25(6):58-59.
[2] 赵延庆,王家杰,何昌轩,等.利用轴载谱确定高速公路沥青路面当量轴载换算系数[J].重庆交通大学学报(自然科学版),2008,27(5):736-739.
ZHAO Yanqing,WANG Jiajie,HE Changxuan,et al.Determination of equivalent axle load factors for asphalt expressways using load spectra [J].Journal of Chongqing Jiaotong University(Natural Science),2008,27(5):736-739.
[3] 罗晓辉,董军,刘海亮.旧混凝土路面加铺沥青层后接缝处的力学模型分析[J].重庆交通大学学报(自然科学版),2007,26(6):82-86.
LUO Xiaohui,DONG Jun,LIU Hailiang.Mechanics model analysis of joint after overlaying asphalt on old concrete pavement [J].Journal of Chongqing Jiaotong University(Natural Science),2007,26(6):82-86.
[4] 徐旭,苏晓芸.超载对沥青路面维修措施的影响研究[J].中外公路,2013,33(5):32-36.
XU Xu,SU Xiaoyun.Impact study of overload on asphalt pavement maintenance measures [J].Journal of China & Foreign Highway,2013,33(5):32-36.
[5] 徐旭,付蓉.道路网络结构可靠度的研究[J].中外公路,2013,33(1):72-76.
XU Xu,FU Rong.Research of reliability of road network structure [J].Journal of China & Foreign Highway,2013,33(1):72-76.
[6] 徐旭,付蓉.基于畅通可靠度的道路网络结构可靠度[J].上海大学学报(自然科学版),2012,18(5):448-453.
XU Xu,FU Rong.Road network structural reliability based on mobility reliability [J].Journal of Shanghai University(Natural Science),2012,18(5):448-453.
[7] 王祺国,徐旭.响应面方法在路面可靠度分析中的应用[J].中外公路,2006,26(4):62-65.
WANG Qiguo,XU Xu.Reliability analysis of pavement structure by response surface method [J].Journal of China & Foreign Highway,2006,26(4):62-65.
[8] 张雄飞,李瑞敏,李宏发,等.基于 Monte Carlo 的行程时间可靠性研究[J].武汉理工大学学报(交通科学与工程版),2012,36(4): 667-670.
ZHANG Xiongfei,LI Ruimin,LI Hongfa,et al.Study on travel time reliability based on Monte Carlo method [J].Journal of Wuhan University of Ttechnology(Transportation Science & Engineering),2012,36(4):667-670.
[9] 刘建荣.基于行程时间可靠性的路网通行能力研究[D].哈尔滨:哈尔滨工业大学,2008.
LIU Jianrong.The Network Capacity Research Based on Travel Time Reliability [D].Harbin:Harbin Institute of Technology,2008.
[10]付蓉.基于网络的路面结构可靠度及优化分析[D].上海:上海大学,2013.
FU Rong.Analysis on Reliability and Optimization of Asphalt Pavement Structure Based on Network [D].Shanghai:Shanghai University,2013.
[11]张勇.考虑路段关联失效的路网行程时间可靠性估计[J].土木工程学报,2008,41(8):87-92.
ZHANG Yong.Estimation of travel time reliability in transportation networks with dependent link failures [J].China Civil Engineering Journal,2008,41(8):87-92.
[12]DIAL R B.A probabilistic multipath traffic assignment model which obviates path enumeration [J].Transportation Research,1971,5(2):83-111.
[13]BELL M G H.Alternatives to Dial’s logit assignment algorithm [J].Transportation Research Part B:Methodological,1995,29(4):287-295.
[14]辛松歆,李军.一种改进的 Logit 型多路径交通分配算法[J].中山大学学报(自然科学版),2007,46(5):29-31.
XIN Songxin,LI Jun.An improved algorithm for Logit multi-path traffic assignment [J].Acta Scientiarum Naturalium (Universitatis Sunyatseni),2007,46(5):29-31.
[15]刘海旭,卜雷,蒲云.随机路网的行程时间可靠性[J].土木工程学报,2004,37(8):102-105.
LIU Haixu,BU Lei,PU Yun.Travel time reliability on stochastic road network [J].China Civil Engineering Journal,2004,37(8):102-105. |