[1] DAGANZO C F. The crane scheduling problem[J]. Transportation Research Part B:Methodological,1989,23(3):159-175.
[2] KIM K H,PARK Y M. A crane scheduling method for port container terminals[J]. European Journal of Operational Research,2004,156:752-768.
[3] LEGATO P,TRUNFIO R,MEISEL F. Modeling and solving rich quay crane scheduling problems[J].Computers & Operations Research,2012,39(9):2063-2078.
[4] CHUNG S H,CHOY K L. A modified genetic algorithm for quay crane scheduling operations[J]. Expert Systems with Applications,2012,39(4):4213-4221.
[5] CHUNG S H,CHAN F T S. A workload balancing genetic algorithm for the quay crane scheduling problem[J].International Journal of Production Research,2013,51(16):4820-4834.
[6] 曾庆成,高宇.集装箱码头装卸桥调度优化模型与算法[J].计算机工程与应用,2006(32):217-219.
ZENG Qingcheng,GAO Yu. Model and algorithm for quay crane scheduling in container terminals[J]. Computer Engineering and Applications,2006(32):217-219.
[7] 周鹏飞,康海贵.面向随机环境的集装箱码头泊位-岸桥分配方法[J].系统工程理论与实践,2008,28(1):161-169.
ZHOU Pengfei,KANG Haigui. Study on berth and quay-crane allocation under stochastic environments in container terminal[J]. Systems Engineering Theory & Practice,2008,28(1):161-169.
[8] 曾庆成,胡祥培,杨忠振.集装箱码头泊位分配-装卸桥调度干扰管理模型[J].系统工程理论与实践,2010,30(11):2026-2035.
ZENG Qingcheng,HU Xiangpei,YANG Zhongzhen. Model for disruption management of berth allocation & quay crane scheduling in container terminals[J]. Systems Engineering Theory & Practice,2010,30(11):2026-2035.
[9] 范志强,乐美龙.最小化最大完工时间与等待时间的岸桥作业调度双目标优化及其遗传算法[J].系统管理学报,2013,22(1):120-127.
FAN Zhiqiang,LE Meilong. A genetic algorithm to minimize the makespan and waiting time for the bi-objective quay crane scheduling problem[J]. Journal of Systems & Management,2013,22(1):120-127.
[10]范志强.考虑任务优先约束的同类岸桥作业调度优化[J].运筹与管理,2013,22(2):235-242.
FAN Zhiqiang. Modeling and solving uniform quay crane scheduling problem with task precedence constraints[J]. Operations Research and Management Science,2013,22(2):235-242.
[11]徐远琴,韩晓龙.集卡与岸桥及场桥联合调度模型优化[J].重庆交通大学学报(自然科学版),2013,32(2):318-320.
XU Yuanqin,HAN Xiaolong. United scheduling model optimization of yard truck,quay crane and yard crane[J]. Journal of Chongqing Jiaotong University(Natural Science),2013,32(2):318-320.
[12]高超锋,胡志华.岸桥并行作业效率约束下泊位与岸桥集成分派[J].重庆交通大学学报(自然科学版),2014,33(3):72-78.
GAO Chaofeng,HU Zhihua. Berth-crane allocation constrained by parallel operation efficiency of quay cranes[J]. Journal of Chongqing Jiaotong University(Natural Science),2014,33(3):72-78.
[13]王昕昕.岸边集装箱起重机动态配置与贝位调度多目标问题研究[D].上海:上海海事大学,2014.
WANG Xinxin. Dynamic Multi-Objective Research on QCs Scheduling ased on the Bay Task[D]. Shanghai:Shanghai Maritime University,2014.
[14]GEN M,CHENG R. Genetic Algorithms and Engineering Optimization[M]. New York:John Wiley,1996. |