[1] SUN Jian, ZHANG Juan, ZHANG H. Michael. Investigation of the early-onset breakdown phenomenon at urban expressway bottlenecks in
Shanghai[J].Transportmetrica B: Transport Dynamic, 2014, 2(3):215-228.
[2] JESUS M, AKYILDIZ S, BISH D R, et al. Network-level optimization of pavement maintenance renewal strategies[J].Advanced
Engineering Informatics, 2011, 25(4): 699-712.
[3] 何海鹰,曾胜,赵健.基于多因素线性模型的项目级路面养护目标确定方法[J]. 铁道科学与工程学报,2011,8(4):40-45.
HE Haiying, ZENG Sheng, ZHAO Jian. Method to determinate objectives of project level pavement maintenance based on multi-factor linear
model[J].Journal of Railway Science and Engineering,2011, 8(4): 40-45.
[4] 刘晨. 陕西省高速公路养护管理的问题及对策思考[D].西安:长安大学, 2014.
LIU Chen. Shaanxi Province Expressway Maintenance Management Problems and Countermeasures[D].Xi’an: Chang’an University, 2014.
[5] 张争奇,郭寒萍,王佳蓉.高速公路养护工区布局方案研究[J].北京工业大学学报,2015,41(7):1043-1048.
ZHANG Zhengqi, GUO Hanping, WANG Jiarong. Research of highway maintenance work area locations[J].Journal of Beijing University of
Technology, 2015, 41(7): 1043-1048.
[6] RYAN Brendan, QU Rong, SCHOCK Alex, et al. Integrating human factors and operational research in a multidisciplinary
investigation of road maintenance [J].Ergonomics, 2011, 54 (5):436-452.
[7] KANNO Yoshihiro. Design of tensegrity structures by using mixed integer programming [C] // Proceedings of the Seventh China-
Japan-Korea Joint Symposium on Optimization of Structural and Mechanical Systems. Dalian, China: Department of Engineering Mechanics,
Dalian University of Technology,2012.
[8] 丁小东,姚志刚,程高.LINGO语言与0-1混合整数规划选址模型的再结合[J].物流工程与管理,2009,31(10):72-75.
DING Xiaodong, YAO Zhigang, CHENG Gao. Lingo language in the logistics distribution center location [J]. Logistics Engineering and
Management, 2009, 31(10): 72-75.
[9] 龚延成.带时效性约束的配送中心多源选址问题研究[J].数学的实践与认识,2007,37(11):27-31.
GONG Yancheng. Study on the location problems of multiple distribution centers with time restrains[J].Mathematics in Practice and
Theory, 2007, 37(11): 27-31.
[10] XIANG Hua, XIAO Hu, WU Weiyuan. Research optimization on logistics distribution center location based on adaptive particle
swarm algorithm[J].Optik-International Journal for Light and Electron Optics, 2016, 127(20): 8443-8450.
[11] HU Xiaobing, WANG Ming, YE Tao, et al. A new method for resource allocation optimization in disaster reduction and risk
governance [J]. International Journal of Disaster Risk Science, 2016, 7 (2):138-150.
[12] YOHAN Shim, MARTE Fodstad, STEVEN A G, et al. A branch-and-bound method for discretely-constrained mathematical programs with
equilibrium constraints[J].Annals of Operations Research, 2013, 210 (1):5-31.
[13] 文宁.水电站工程砂石料场优化选择[J].西北水电,2008(3):23-26.
WEN Ning. On optimizing selection of sand & stone borrow area for hydropower project[J].Northwest China Hydropower, 2008(3): 23-26.
[14] 王磊.高速公路路面养护的经济性探讨[J].城市建筑,2014(4):286.
WANG Lei. Discuss the economy of highway pavement maintenance[J].Urbanism and Architecture, 2014(4): 286.
[15] 朱莹. 高速公路养护管理系统的研究与运用[D].武汉:湖北工业大学,2014.
ZHU Ying. Study and Application of Highway Maintenance Management System[D].Wuhan: Hubei University of Technology, 2014. |