[1] EASTMAN C. Automated assessment of early concept designs[J]. Architectural Design, 2009, 79(2): 52-57.
[2] LAISERIN J.EasySite 2.0-integration of CAD-based building models with map-based terrain models [J]. Computer Graphics World, 2001, 24(2): 62-63.
[3] YALCINKAYA M, SINGH V. Patterns and trends in Building Informa-tion Modeling (BIM) research: A latent semantic analysis [J]. Automation in Construction, 2015(59): 68-80.
[4] ABANDA F, BYERS L. An investigation of the impact of building orientation on energy consumption in a domestic building using emerging BIM (Building Information Modelling) [J]. Energy(Oxford), 2016(97): 517-527.
[5] ASL M, ZARRINMEHR S, BERGIN M, et al. BPOpt: A framework for BIM-based performance optimization[J]. Energy and Buildings, 2015 (108): 401-412.
[6] LEE Seulki, YU Junho. Comparative study of BIM acceptance between Korea and the United States[J]. Journal of Construction Engineering and Management, 2016, 142(3): 5015016.
[7] WONG P, SALLEH H, RAHIM F. A relationship framework for building information modeling (BIM) capability in quantity surveying practice and project performance [J]. Informes De La Construccion, 2015, 67(540): e199.
[8] NINIC J, BUI H G, KOCH C, et al. Computationally efficient simulation in urban mechanized tunneling based on multilevel BIM models[J]. Journal of Computing in Civil Engineering, 2019, 33(3): 4019007.
[9] YANG Tao, LU Yuquan, QIN Haiyang. CATIA-based BIM technology in highway tunnel design[J]. Stavební Obzor, 2019, 2019(3): 469-482.
[10] 孙建诚, 李永鑫, 王新单. BIM技术在公路设计中的应用[J]. 重庆交通大学学报(自然科学版), 2017, 36(11): 23-27.
SUN Jiancheng, LI Yongxin, WANG Xindan. Application of BIM technology in highway design[J]. Journal of Chongqing Jiaotong University (Natural Science), 2017, 36 (11): 23-27.
[11] DAVIES A, MACAULAY S, DABARRO T, et al. Making innovation happen in a megaproject: Londons crossrail suburban railway system[J]. Project Management Journal, 2014, 45(6): 25-37.
[12] 孙建诚,朱双晗,蒋浩鹏. BIM技术在公路边坡的应用探究[J].重庆交通大学学报(自然科学版),2019,38(9):63-67.
SUN Jianchen, ZHU Shuanghan, JIANG Haopeng. Application of BIM technology to highway slope[J]. Journal of Chongqing Jiaotong University (Natural Science), 2019, 38(9): 63-67.
[13] 熊桂开,朱丽丽,薛梅. GIS-BIM技术在山地城市路网优化设计中的应用[J]. 重庆交通大学学报(自然科学版),2017,36(4):90-95.
XIONG Guikai, ZHU Lili, XUE Mei. Application of GIS-BIM technology in the optimization design of road network in mountainous city[J]. Journal of Chongqing Jiaotong University (Natural Science), 2017, 36(4): 90-95.
[14] ZHOU Weihong, QIN Haiyang, QIU Junling, et al. Building informa-tion modelling review with potential applications in tunnel engineering of China[J]. Royal Society Open Science, 2017, 4(8): 1-16.
[15] 秦海洋,赖金星,唐亚森,等. BIM在隧道工程中的应用现状与展望[J]. 公路,2016,61(11):174-178.
QIN Haiyang, LAI Jinxing,TANG Yasen, et al. Status and prospect of BIM application in tunnel engineering[J]. Highway, 2016, 61(11): 174-178.
[16] 王超,周磊生,徐润,等. BIM施工综合管理平台在隧道工程中的应用研究[J].重庆交通大学学报(自然科学版),2020,39(9):74-79,87.
WANG Chao, ZHOU Leisheng, XU Run, et al. Application of BIM construction integrated management platform in tunnel engineering [J]. Journal of Chongqing Jiaotong University (Natural Science), 2020, 39(9): 74-79, 87.
[17] 戴林发宝,王春梅,邓朝辉,等.BIM技术在新鼓山隧道复杂段设计中的应用[J].铁路技术创新,2015(6):77-79.
DAI-LIN Fabao, WANG Chunmei, DENG Zhaohui, et al. Application of BIM technology in design of the complex section of Xingushan tunnel[J]. Railway Technical Innovation, 2015(6): 77-79.
[18] 李延. 宝兰客专石鼓山隧道BIM技术的研究及应用[J]. 铁路技术创新,2014(5):64-65.
LI Yan. Research and application of BIM technology in Shigushan tunnel of Baoji-Lanzhou high-speed railway [J]. Railway Technical Innovation, 2014(5): 64-65. |