[1] PENG Yun, LI Xiangda, WANG Wenyuan, et al. A simulation-based research on carbon emission mitigation strategies for green container terminals [J]. Ocean Engineering, 2018, 163(8): 288-298.
[2] THALIS P. Prospects of cold ironing as an emissions reduction option [J]. Transportation Research Part A, 2019, 119(9): 82-95.
[3] WU Lingxiao, WANG Shuaian,AN W. The shore power deployment problem for maritime transportation [J]. Transportation Research Part E, 2020, 135(11): 1-12.
[4] WILLIAM J H. Assessment of CO2 and priority pollutant reduction by installation of shoreside power [J]. Resources Conservation and Recycling, 2010, 54(6): 462-467.
[5] YIN Ming, YI Wang, ZHANG Qiang. Policy implementation barriers and economic analysis of shore power promotion in China [J]. Transportation Research Part D, 2020, 87(3): 10-27.
[6] PENG Yun, LI Xiangda, WANG Wenyuan, et al. A method for determining the required power capacity of an on-shore power system considering uncertainties of arriving ships [J]. Sustainability, 2018, 10(2): 2-17.
[7] PENG Yun, LI Xiangda, WANG Wenyuan, et al. A method for determining the allocation strategy of on-shore power supply from a green container terminal perspective [J]. Ocean and Coastal Management, 2019, 167(9): 158- 175.
[8] 焦小刚.考虑泊位疏浚的连续型泊位和动态岸桥联合调度[J].运筹与管理,2020,29(2):47-57.
JIAO Xiaogang. Joint scheduling of continuous berth and dynamic quay bridge considering berth [J]. Operations Research and Management, 2020, 29 (2): 47-57.
[9] BIN Jin, XIAO Huiyuan, YAN Bin, et al .Exact and heuristic methods for optimizing lock-quay system in inland waterway [J]. European Journal of Operational Research, 2019, 277(9):740-755.
[10] JUAN F, CORRECHER T, VANDEN B .The berth allocation problem in terminals with irregular layouts [J]. European Journal of Operational Research, 2019, 272(2): 1098-1108.
[11] HSIEN P, HSU T, LIN C. An improved shuffled frog-leaping algorithm for solving the dynamic and continuous berth allocation problem (DCBAP) [J]. Applied Sciences, 2019, 142(11): 1-28.
[12] 张雯钰,郝杨杨.基于船舶作业优先权的靠泊计划仿真优化研究[J].计算机仿真,2020,37(6):130-134.
ZHANG Wenyu, HAO Yangyang. Simulation and optimization of berthing plan based on ship operational priority [J]. Computer Simulation, 2020, 37 (6): 130-134 .
[13] AMIRSALAR M,AHMADIA M,ALINAGHIAN A,et al . Integrated continuous berth allocation and quay crane assignment and scheduling problem with time-dependent physical constraints in container terminals [J]. Computers & Industrial Engineering, 2020, 147(6): 167-144.
[14] 那广哲. 集装箱码头动态连续型泊位分配问题研究[D].大连:大连海事大学,2015:1-63.
NA Guangzhe. Research on Dynamic Continuous Berth Allocation of Container Terminal [D]. Dalian: Dalian Maritime University, 2015.
[15] ZHEN Luling, ZHU Gedan, LEE Loohay. Daily berth allocation in a tidal port with channel flow control [J]. Transportation Research Part B, 2019, 106(4): 193-217 .
[16] 李善俊,陈淮莉.基于NSGA II 的带时间窗生鲜品配送路径优化[J].上海海事大学学报,2020,41(2):58-41.
LI Shanjun, CHEN Huaili. Optimization of raw food distribution path with time window based on NSGA II [J]. Journal of Shanghai Maritime University,2020, 41(2):58-41.
[17] NIKOLETTA L,TRIVYZAA A R. Impact of carbon pricing on the cruise ship energy systems optimal configuration [J]. Energy, 2019, 175(2): 952-966.
[18] WANG T S, WANG X C. Joint berth allocation and quay crane assignment under different carbon taxation policies [J]. Transpor- tation Research Part B, 2018, 117(5): 18-36. |