[1] 张士铎,邓小华,王文州.箱形薄壁梁剪力滞效应[M].北京:人民交通出版社,1998:19-45.
Zhang Shiduo,Deng Xiaohua,Wang Wenzhou.Shear Lag Effect of Thin-Walled Box Girder [M].Beijing:China Communications Press,1998:19-45.
[2] 项海帆.高等桥梁结构理论[M].北京:人民交通出版社,2001:50-72.
Xiang Haifan.Advanced Theory of Bridge Structures [M].Beijing:China Communications Press,2001:50-72.
[3] 吴幼明,罗旗帜,岳珠峰.薄壁箱梁剪滞效应的能量变分法[J].工程力学,2003,24(4):161-165.
Wu Youming,Luo Qizhi,Yue Zhufeng.The shear lag effect in thin walled box beam energy variation method [J].Engineering Mechanics,2003,24(4):161-165.
[4] 周世军.箱梁的剪力滞效应分析[J].工程力学,2008,25(2):204-208.
Zhou Shijun.Shear lag analysis of box girders [J].Engineering Mechanics,2008,25(2):204-208.
[5] 郭金琼,房贞政,罗孝登.箱形梁桥剪力滞效应分析[J].土木工程学报,1983,16(1):1-13.
Guo Jinqiong,Fang Zhenzheng,Luo Xiaodeng.Analysis of shear lag effect in box girder bridge [J].China Civil Engineering Journal,1983,16(1):1-13.
[6] 刘世忠, 欧阳永金.变截面薄壁箱梁剪力滞剪切变形效应分析[J].中国公路学报,2001,15(3):61-67.
Liu Shizhong,Ouyang Yongjin.Deformation analysis of thin walled box girder shear [J].China Journal of Highway and Transport,2001,15(3):61-67.
[7] 曹国辉,方志.薄壁箱梁剪滞效应研究方法[J].湖南城市学院学报,2003,24(3):8-9.
Cao Guohui,Fang Zhi.Research methods of shear lag effect in thin walled box girder [J].Journal of Hunan City University,2003,24(3):8-9.
[8] Chang S T.Shear-lag effect in simply supported,prestressed concrete box-girder bridge [J].Journal of Bridge Engineering,2004,9(2):178-184.
[9] Reissner E.Analysis of shear lag in box beam by principle of minimum potential energy [J].Quarterly of Applied Mathematics,1946,5(3):268-278.
[10] Kuzmanovic B O,Graham H J.Shear lag in box girders [J].Journal of Structural Division,1981,107(9):1701-1712.
|