重庆交通大学学报(自然科学版) ›› 1994, Vol. 13 ›› Issue (S1): 113-117.
• • 上一篇 下一篇
魏道昇
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
Wei Daosheng
Received:
Revised:
Online:
Published:
摘要: 工程施工网络计划中的工序时差是工序可利用的机动时间,总时差与自由时差以及独立时差之间存在着内在的联系,研究它们之间的关系有助于我们进行计划的编制。调整以及在施工中对工程进度的控制,从而获得更大的社会效益与经济效益。
关键词: 网络计划, 时差, 时差利用
Abstract: The activity float of network plan in a engineering cons-truction is the time kept in reverse for uti~lization of activity.There are some relations among the total float,the free float and the independentfloat.Studing their relations could help us in making and adjusting the plan and in controling theplanned engineering speed,and we can thus get much more in social and economical benefit.
Key words: network plan, float, utilization of float
中图分类号:
TB114.2
魏道. 工程施工网络计划的时差分析与利用[J]. 重庆交通大学学报(自然科学版), 1994, 13(S1): 113-117.
Wei Daosheng. Float Analysis and Utilization of Network Plan for Engineering Construction[J]. Journal of Chongqing Jiaotong University(Natural Science), 1994, 13(S1): 113-117.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://xbzk.cqjtu.edu.cn/CN/
http://xbzk.cqjtu.edu.cn/CN/Y1994/V13/IS1/113