[1]Dessouky M,Hall R,Zhang L,et al. Real-time control of buses for schedule coordination at a terminal[J]. Transportation Research A,2003(3) : 145-164.
[2]Simon J,Furth P G. Generating a bus route O-D matrix from on-off data[J]. Journal of Transportation Engineering (American Societyof Civil Engineers) ,1985,111(6) : 583-593.
[3]张林峰,范炳全,吕智林. 公交网络换乘矩阵的分析与算法[J]. 系统工程,2003,21(6) : 92-96.
Zhang Linfeng,Fan Bingquan,Lu Zhilin. Transfer matrix of publictransit network and algorithm[J]. Systems Engineering,2003,21(6) : 92-96.
[4]袁曾任. 人工神经元网络及其应用[M]. 北京: 清华大学出版社, 1999.
Yuan Zengren. Artificial Neural Network Theory and Its Application [M]. Beijing: Tsinghua University Press, 1999.
[5]杨新苗,王炜,顾维平,等. 公交线路客流模糊神经网络预测模型[J]. 公路交通科技,2000, 17(4) : 38-41.
Yang Xinmiao,Wang Wei,Gu Weiping,et al. Applying fuzzy neural network to predict bus line passenger flow[J]. Journal of Highway and Transportation Reseach and Development,2000,17 (4 ) :38-41.
[6]周涛,翟长旭,高志刚. 基于公交IC 卡数据的OD 推算技术研究[J]. 城市交通,2007,5(3) : 48-52.
Zhou Tao,Zhai Changxu,Gao Zhigang. Approaching bus OD matrices based on data reduced from bus IC cards[J]. Urban Transport of China, 2007,5(3) : 48-52.
[7]Kikuchi S,Tanaka M. Estimating an O-D table under repeated counts of in-out volumes at highway ramps: use of artificial neural networks[C]. Washington,D. C. : The 79th TRB Annual Meeting,1999: 59-66.
[8]胡华,刘志钢,高云峰. 面向换乘枢纽的轨道交通与道路公交协调调度方法[J]. 城市轨道交通研究,2011(10) : 49-52,70.
Hu Hua,Liu Zhigang,Gao Yunfeng. Coordination dispatching between urban rail transit and regular bus for transfer center[J]. Urban Mass Transit,2011(10) : 49-52,70 |