[1] 黄卫.大跨径桥梁钢桥面铺装设计[J].土木工程学报,2007,40(9):65-77.
HUANG Wei.Design of deck pavement for long-span steel bridges [J].China Civil Engineering Journal,2007,40(9):65-77.
[2] 童乐为,沈祖炎.正交异性钢桥面板疲劳验算[J].土木工程学报,2000,33(3):16-21.
TONG Lewei,SHEN Zuyan.Fatigue assessment of orthotropic steel bridge decks [J].China Civil Engineering Journal,2000,33(3):16-21.
[3] 孙春林.润扬长江公路大桥钢桥面铺装养护维修的监理要点[J].华东公路,2013(1):13-15.
SUN Chunlin.Supervision points of maintenance and repair of Runyang Yangtze river highway bridge steel deck pavement [J].East China Highway,2013(1):13-15.
[4] 陈斌,邵旭东,曹君辉.正交异性钢桥面疲劳开裂研究[J].工程力学,2012,29(12):170-174.
CHEN Bin,SHAO Xudong,CAO Junhui.Study of fatigue cracking for orthotropic steel bridge deck [J].Engineering Mechanics,2012,29(12):170-174.
[5] 王迎军,朱桂新,陈旭东.虎门大桥钢桥面铺装的使用和维护[J].公路交通科技,2004,21(8):64-67.
WANG Yingjun,ZHU Guixin,CHEN Xudong.The using and maintenance of the steel deck pavement in Humen Bridge [J].Journal of Highway and Transportation Research and
Development,2004,21(8):64-67.
[6] 章莹.超薄磨耗层施工技术在高速公路养护中的应用[J].安徽建筑,2009,16(5):99-100.
ZHANG Ying.The application of nova chip surface treatment process to highway surface maintenance [J].Anhui Architecture,2009,16(5):99-100.
[7] 钟建驰.润扬长江公路大桥建设(悬索桥)[M].北京:人民交通出版社,2006,3-20.
ZHONG Jianchi.Construction of Runyang Yangtze River Highway Bridge (Suspension Bridge)[M].Beijing:China Communications Press,2006,3-20.
[8] 王亚飞,徐海鹰.热点应力法进行钢桥疲劳检算[J].铁道工程学报,2012(9):49-58.
WANG Yafei,XU Haiying.Check of steel bridge fatigue with hot spot stress method [J].Journal of Railway Engineering Society,2012(9):49-58.
[9] 蒲黔辉,高立强,刘振标,等.基于热点应力法的正交异性钢桥面板疲劳验算[J].西南交通大学学报,2013,48(3):395-401.
PU Qianhui,GAO Liqiang,LIU Zhenbiao,et al.Fatigue assessment of orthotropic steel bridge deck based on hot spot stress method [J].Journal of Southwest Jiaotong
University,2013,48(3):395-401.
[10]中交公路规划设计院.公路桥涵设计通用规范:JTG D60—2004[S].北京:人民交通出版社,2004.
CCCC Highway Consultants.General Code for Design of Highway Bridge and Culverts:JTG D60—2004[S].Beijing:China Communications Press,2004.
[11]RASMUS W,JOHN F.Analysis of an orthotropic deck stiffened with a cement-based overlay [J].Journal of Bridge Engineering,2007,12(3):350-363.
[12]HOBBACHER,A F.Recommendations for Fatigue Design of Welded Joints and Components[R].Paris:International Institute of welding,2003.
[13]HOBBACHER A F.The new IIW recommendations for fatigue assessment of welded joints and components-a comprehensive code recently updated [J].International
Journal of Fatigue,2009(31):50-58.
[14]FRUCKE W.Recommended hot spot analysis procedure for structural details of ships and FPSOs based on round-robin fe analyses [J].International Journal of
Offshore and Polar Engineering,2002,12(1):40-47.
[15]邵旭东,张哲,刘梦麟,等.正交异性钢-UHPC组合桥面板弯拉强度的实验研究[J].湖南大学学报(自然科学版),2012,39(10):7-13.
SHAO Xudong,ZHANG Zhe,LIU Menglin,et al.Research on bending tensile strength for composite bridge deck system composed of orthotropic steel deck and thin RPC topping[J].Journal of Hunan University(Natural Science),2012,39(10):7-13.
[16]周环宇.钢-活性粉末混凝土(RPC)组合梁界面受剪分析[D].长沙:湖南大学,2013:36-41.
ZHOU Huanyu.Research on the Interfacial Shear Resistance of the Composite Deck System Composed of Orthotropic Deck and Ultra-thin RPC Layer[D].Changsha:Hunan
University,2013:36-41.
[17]JALIREZA R.Computer Modeling and Investigation on the Steel Corrosion in Cracked Ultra High Performance Concrete[D].Kassel:Kassel University,2012:182-184. |