重庆交通大学学报(自然科学版) ›› 1999, Vol. 18 ›› Issue (1): 86-92.
• • 上一篇 下一篇
尹崇清, 缪吉伦, 张绪进
收稿日期:
出版日期:
发布日期:
作者简介:
Yin Chongqing, Miao Jilun, Zhang Xujin
Received:
Online:
Published:
摘要: 通过能量方程对吴家街电站下游河道疏浚治理新方案的计算分析,研究了下游河段不同开挖方案电站下游河道可利用水头的增加值与工程量之间的关系,分析了下游河段最佳利用水头及相应的工程量,并对下游河道的演变与挖槽的稳定性等问题进行了分析论证.
关键词: 电站, 下游河道, 挖槽, 可利用水头, 工程量
Abstract: Based on energy equation, new scheme of dredging and training for downstream river course at Wu Jia jie power station is calculated.In case of a variety of schemes for excavated trough, the relation between increment of utilizable hydraulic head and engineering quantity of downstream river course at the power station is studied.Optimum utilizable hydraulic head and corresponded engineering quantity of downstream river course are analyzed.Evolution and stability of downstream river course are expounded as well.
Key words: hydropower station, downstream river course, excavated trough, utilizable hydraulic head, engineering quantity.
尹崇清, 缪吉伦, 张绪进. 吴家街电站下游河道可利用水头数值计算分析[J]. 重庆交通大学学报(自然科学版), 1999, 18(1): 86-92.
Yin Chongqing, Miao Jilun, Zhang Xujin. Numerical Analysis of Utilizable Hydraulic Head for Downstream River Course at Wu Jia Jie Power Station[J]. Journal of Chongqing Jiaotong University(Natural Science), 1999, 18(1): 86-92.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://xbzk.cqjtu.edu.cn/CN/
http://xbzk.cqjtu.edu.cn/CN/Y1999/V18/I1/86