预应力锚索不均匀受力原因分析及对策

邢晓飞1, 师亚龙1, 沈文辉2, 卢颖明3   

  1. (1. 中铁西南科学研究院有限公司,四川 成都 611731; 2. 中铁马来西亚东方隧道公司,马来西亚 吉隆坡,58100; 3. 武汉地铁集团有限公司,湖北 武汉 430030)
  • 收稿日期:2018-05-21 修回日期:2018-10-11 出版日期:2019-09-18 发布日期:2019-09-18
  • 作者简介:邢晓飞(1986—),男,山西忻州人,工程师,主要从事岩土与地下工程方面的研究。E-mail:xingxiaofei_crsi@163.com。 通信作者:师亚龙(1987—),男,河南平顶山人,工程师,主要从事隧道与地下工程方面研究。E-mail:shiyalong_crsi@163.com。

Analysis and Solution to Uneven Force of Prestressed Anchor Cable

XING Xiaofei1, SHI Yalong1, SHEN Wenhui2, LU Yingming3   

  1. (1. Southwest Research Institute Co., Ltd, of C.R.E.C, Chengdu 611731, Sichuan, P. R. China; 2. Dong Fang Tunnel Sdn. Bhd., Kuala Lumpur 58100, Malaysia; 3. Wuhan Metro Group Co., Ltd, Wuhan 430030, Hubei, P. R. China)
  • Received:2018-05-21 Revised:2018-10-11 Online:2019-09-18 Published:2019-09-18

摘要: 针对吉隆坡地铁大马城北站在张拉预应力锚索过程中,发现的部分预应力锚索受力不均匀,偏心现象严重,甚至有的偏心受力多达80%以上,严重影响基坑支护结构的安全性的情况。笔者首先分析了引起锚索不均匀受力的影响因素,然后提出了在锚垫板下添加一种辅助纠偏装置,并通过现场试验进行多次张拉试验进行验证。试验结果表明:在未安装该纠偏装置前,多数锚索存在较大不均匀受力;安装该纠偏装置,可以有效降低锚索的不均匀受力;结合该车站锚索设计资料提出锚索的最大偏心受力不宜大于30%。

关键词: 隧道工程, 锚索, 偏心受力, 现场试验, 纠偏装置

Abstract: The tensioning process of pre-stressed anchors in Bandar Malaysia north subway station found that some of them were unevenly loaded and as seriously eccentric as with a force of more than 80%, which severely affected the safety of foundation pit supporting structures. Owing to this, the factors causing uneven anchorage force were analyzed, and the adding of a correcting device under the anchor plate was proposed and multiple tensile tests were conducted for verification. The results show that most anchor cables have large uneven forces before the corrective device is installed and the installation of a correcting device effectively reduces the anchor cables uneven force. Finally, combined with the design information of the anchor cables in the station, it is proposed that the maximum eccentric force should exceed no more than 30%.

Key words: tunnel engineering, anchor, uneven force, filed test, deviation correction device