[1]王峰.沪宁高铁与邻近既有线振动相互影响的测试与分析[J].
北京交通大学学报,2
012, 36(4): 13-18.
Wang Feng.Test and analysis for vibration influence between Huning
high-speed railway and adjacent existing line [J].Journal of
Beijing Jiaotong University,2012,36(4): 13-18.
[2]郭玉坤.邻近铁路营业线软土地基施工风险控制研究[J].上
海铁道科技,2
012(1): 98-99.
Guo Yukun.Soft ground close to operating railway construction risk
control study [J].Shanghai Railway Science & Technology,2012
(1): 98-99.
[3]董锋.邻近既有铁路的地下连续墙施工技术与安全控制[J].
建筑施工,2
011,3
3(4): 270-272.
Dong Feng.Construction technology and safety control over diaphragm
wall adjacent to existing railway [J].Buliding Construction,
2011,33(4): 270-272.
[4]马如岭.跨铁路线78m 钢桁梁顶推施工[J].铁道建筑,2006
(2): 15-16.
Ma Ruling.78m steel truss incremental launching construction
crossing railway [J].Railway Engineering,2006(2): 15-16.
[5]李兴舟,郑培英.对箱梁顶推施工工艺的探讨[J].科技资讯,
2006(8): 49-50.
Li Xingzhou,Zheng Peiying.The investigation for box girder incremental
launching construction technology [J].Science & Technology
Information,2006(8): 49-50.
[6]李天政.层次分析法原理及应用举例[J].内江职业技术学院
学报,2
008,2
(4): 52-55.
Li Tianzheng.The principle and application of AHP[J].Journal of
Neijiang Vocational and Technical Academy, 2008,2
(4): 52-55.
[7]黄德才.层次分析方法中层次单排序的新方法[J].控制与决
策,1
998,13(4): 705-708.
Huang Decai.New Method for single-level sequencing in the analytic
hierarchy process [J].Control and Decision,1998,13 (4 ):
705-708.