Abstract: In order to ensure the security and reliability of the transportation, loading and unloading of heavy cargo for Xiangjiaba hydropower station in Jinsha River, it is required to have a contrasting test study on several wharf locations and their corresponding wharf types which are designed in the preliminary process, including the layout of the project, water area conditions, ship entering-departing conditions, wharfing loading-unloading conditions and their influence on waterway of Jinsha River. Meanwhile, the recommendation project and advice are put forward, which will provide a scientific basis for the location and design of heavy cargo wharf.
Key words: heavy cargo wharf , site selection , water conditions , Xiangjiaba hydropower station in Jingsha River ;
摘要: 为了确保金沙江向家坝水电站重大件运输、装卸的安全、可靠,需对设计初拟的多个港址及相应码头型式,就 工程布置、水域条件、船舶进出港条件、靠泊装卸条件及其对金沙江航道的影响等进行对比试验研究,并提出推荐 方案和建议,为重大件码头选址和设计提供科学依据。
关键词: 重大件码头, 港址, 水域条件, 金沙江向家坝水电站
CLC Number:
U651+.2
LIU Ya-hui,CHEN Xue. Study on Locating and Navigating Conditions of Heavy Cargo Wharf at Xiangjiaba Hydropower Station in Jinsha River[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(1): 139-141.
刘亚辉,陈??雪. 金沙江向家坝重大件码头选址与通航条件研究[J]. 重庆交通大学学报(自然科学版), 2009, 28(1): 139-141.