[1] |
ZHOU Yin, ZHANG Xuesong, DING Yanchao.
Application of Stress-Free State Method in Long-Span
Arch Bridge Construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2018, 37(08): 6-10.
|
[2] |
HAO Niebing, GU Anbang.
Alignment Adjustment Method of Concrete Filled Steel Tubular Arch Bridge in Arch Rib Hoisting
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2016, 35(3): 1-5.
|
[3] |
Sun Yongming, Rong Xueliang, He Xiaodong.
Control Method of Concrete Continuous Bridge by Cantilever Casting Construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2015, 34(4): 28-33.
|
[4] |
Liu Ke.
Reliability Design of Asphalt Mixture with Consideration of
Asphalt-Aggregate Ratio Fluctuation
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2012, 31(5): 974-978.
|
[5] |
Liu Jia-min,,Cui Ying-ming,Xiao Jun,Zhang Yong-shui.
Construction Control Program Development for Superstructure
Suspension Bridge Based on Analytical Method
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2012, 31(4): 760-763.
|
[6] |
WEI Li-dong,XIANG Zhong-fu,ZHAN Ning.
Control Technology of Half-Through CFST Arch Bridge Construction
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2011, 30(6): 1311-1313.
|
[7] |
HUANG Bing-shi, TANG Shou-feng, ZHAO Can-hui.
Structure Behavior and Construction Monitoring Key Technology in Construction of Edong Changjiang River Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(5): 688-692.
|
[8] |
SUN Ce-shi,ZHOU Shui-xing,TONG Jian-sheng.
Discussions on Characteristics of Construction Control for Extra-dosed
Partially Cable-stayed Bridges
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2010, 29(2): 177-179.
|
[9] |
LU Yi,YAN Dong-huang,CHEN Chang-song,LIU Wen-Deng.
Influence Analysis on Catwalk Load in the Construction Control of Suspension Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2009, 28(1): 20-22.
|
[10] |
CHEN Si-tian, WANG Zhi-peng, LIU Peng, YUAN Yuan.
Construction Control of Caiyuanba B Ramp Continuous Rigid Frame Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2008, 27(1): 28-31,36.
|
[11] |
LI Xi,GU An-bang,QIAO Wei-guo.
Application of Neural Network Method to Parameters Identification
of Shibanpo Bridge in Chongqing
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(5): 13-16.
|
[12] |
LIU Xiao-yu, TANG Wan-min.
Structure Analysis and Construction Cntrols during Hoisting and
Installation of Structural Member of Heyang Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(3): 29-32.
|
[13] |
ZENG De-rong,LIU Hong-wei,DENG Xue-tao.
Study on the Construction Control Project for Chongqing Yudong Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(3): 36-40.
|
[14] |
CHEN Si-tian;ZHAO Li-li;GONG Shang-long;LIU Shui.
Construction Control of the
Xiaoanxi Continuous Rigid Frame Bridge
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2007, 26(2): 47-50.
|
[15] |
SUN Yu-ping,SHEN Rui-li,TANG Mao-lin,WU Tan,LIU Bao-wen.
The construction control of tensioning of anchor span strand for
erecting suspensio bridges
[J]. Journal of Chongqing Jiaotong University(Natural Science), 2006, 25(6): 12-16.
|