中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2002, Vol. 21 ›› Issue (1): 59-61.

Previous Articles     Next Articles

An introduction to some non-conventional processes in subgrade construction

LUO Tao   

  1. Beijing Huahong Road & Bridge Consultant Surpervising Co,Beijing 100024,China
  • Received:2001-06-04 Online:2002-03-15 Published:2015-05-18

路基施工若干非常规工艺简介

罗涛   

  1. 北京华宏路桥咨询监理公司,北京100024
  • 作者简介:罗涛(1971—),男,四川成都人,工程师,从事技术管理及科研工作

Abstract: To solve the specific problem by using non conventional construction process confirmed that it is benefiial for quality assurance and quality control in the field.The So called non conventional process is not against conventional process or operation procedure but obeys the same principle and solve specific problems with specific treatment.It is also a useful aid to the conventional procedure

Key words: inverted arch method, concentration fill, sandgravel fill, abutment back fill

摘要: 用非常规的施工工艺来解决路基施工中的一些具体问题,在实践中证明对工程质量和进度的现场控制是有 利的。非常规工艺并非违背常规工艺或操作程序,而是在原理相同的前提下,本着具体问题具体对待的原则,对 常规工艺、程序及方法的又一补充

关键词: 倒拱法, 集中填筑, 砂砾填筑, 台背回填

CLC Number: