Journal of Chongqing Jiaotong University(Natural Science) ›› 2002, Vol. 21 ›› Issue (1): 68-73.
Previous Articles Next Articles
HUANG Xiao-hua1,HUANG Ru-xiang2,LIU Jie2
Received:
Online:
Published:
黄晓华1,黄汝祥2,刘杰2
作者简介:
Abstract: This article takes the Yangmei Mountain(K16+930K17+260) fault trough high side slope control project on the Jing Zhu Expressway Guangdong Section North Part B Stake coal stratum gob as example and introduces the comprehensive control engineering practice on high side slope by the supporting and retaining structure such as reinforced concrete hand hole digging no skid pile and prestressed anchor line ground beam,and the slope face protection measures such as full paved paste building schistose
Key words: high side slope, hole digging no skid pile, prestressed anchor line, supporting and retaining structure, protection measures
摘要: 以京珠高速公路粤境北段B标煤系地层采空区的杨梅山(K16+930~K17+260)路堑高边坡治理工程为例,介 绍钢筋砼人工挖孔抗滑桩、预应力锚索地梁等支挡结构,满铺浆砌片石护面墙、砼空心六菱块植草等坡面防护措施, 结合排水、减载等多种工程手段综合治理高边坡的工作实践
关键词: 高边坡, 挖孔抗滑桩, 预应力锚索, 支挡结构, 防护
CLC Number:
U416.1+3
U416.1+4
HUANG Xiao-hua,HUANG Ru-xiang,LIU Jie. Preliminary probe of high side slope reinforcing control project on coal stratum gob road highway fault trough[J]. Journal of Chongqing Jiaotong University(Natural Science), 2002, 21(1): 68-73.
黄晓华,黄汝祥,刘杰. 煤系地层采空区公路路堑高边坡的加固治理[J]. 重庆交通大学学报(自然科学版), 2002, 21(1): 68-73.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://xbzk.cqjtu.edu.cn/EN/
http://xbzk.cqjtu.edu.cn/EN/Y2002/V21/I1/68