JIN Xiao-qin , SHAO Xu-dong. Study and practice on integral abutment bridge[J]. Journal of Chongqing Jiaotong University(Natural Science), 2002, 21(3): 7-10.
[1]SAMI W.TABSH and SHEHABMOURAD.Live load Distrbution
in Integral Composite Steel Bridges[J].Engingeering
Journal,1998,35 (1):12-18.
[2]HENRY G.RUSSELL and LEE J GERKEN.Jointless
Bridges-the Knowns and the Unknown [J].Concrete International
April,1994,(4):21-23.
[3]PATERSON G P.The Uk department of transport view on
continuity/integral bridges [A].PRITCHARD B P.Continuous
and Integral bridges [C].E & FN Spon,2-6
Boundary Row,london,1994.
[4]TAKANO H (Japan).Study on jointless bridge construction
in Japan [A].PRITCHARCL B P.Continuous and Integral
bridges [C].E & FN Spon,2-6 Boundary Row,London,
1994.
[5]李扬海,程潮洋,鲍卫刚,等。公路桥梁伸缩装置
[M].北京:人民交通出版社,1999。
[6]高启聚译。路面裂缝和坑槽产生的原因与防治[J]。
国外公路,1999,19 (1):16-18。
[7]周富杰,胡 圣.反射裂缝产生和发展的机理[J]。
国外公路,1997,17 (2):12-16。
[8]湖南大学土木工程学院。无缝桥梁在城市桥梁中的
应用研究[R]。长沙:2000