中文核心期刊
CSCD来源期刊
中国科技核心期刊
RCCSE中国核心学术期刊

Journal of Chongqing Jiaotong University(Natural Science) ›› 2002, Vol. 21 ›› Issue (3): 90-93.

Previous Articles     Next Articles

Estimation of the project control network element all of the precision

XU Xi1 , ZHEN Fan-xiang2   

  1. 1.Department of Highway Engineering Chongqing Jiaotong University.Chongqing 400074, China ; 2.Department of Bridge &Structure Engineering , Chongqing Jiaotong University , Chongqing 400074 , China
  • Received:2001-11-22 Online:2002-09-15 Published:2015-05-18

控制网元素的全精度估计

徐兮1,曾繁祥2   

  1. 1.重庆交通学院道路工程系,重庆400074;2.重庆交通学院桥梁及结构工程系,重庆400074
  • 作者简介:徐兮(1957 — ),女,重庆人,副教授,现从事测量教学和科研工作

Abstract: While establishing the project control network , It usually encounters coordinated point and established fundamental point some or all of the same , class , this paper uses fundamentals of generalized smoothen .It can effectively solve the problem of start data smoothen , and pledye the precision of the project control network

Key words: fundamental network , precision , smoothen

摘要: 在布设工程控制网时,常遇到依据点与所布点部分或全部同级的情况,笔者应用广义平差原理,有效地解 决了起始数据平差的问题,从而保证了控制网精度

关键词: 控制网, 精度, 平差

CLC Number: