[1]张杨永. 斜拉桥近似计算与结构体系研究[D]. 上海: 同济大学,
2010.
Zhang Yangyong. Approximate Calculation and Study of Structural System in Cable-Stayed Bridge[D]. Shanghai: Tongji University,2010.
[2]Gimsing N J. Cable Supported Bridges: Concept & Design[M].London: John Wiley & Sons,1997: 52-68.
[3]李国豪. 大跨桥梁发展概略[M]. 上海: 同济大学出版社,1987: 1-10.
Li Guohao. Outline of Development for Cable-Stayed Bridge[M].Shanghai: Tongji University Press,1987: 1-10.
[4]Meier U. Structural tensile elements made of advanced composite materials[J]. Structural Engineering International,1999,99 (4) : 281-285.
[5]Muller J M. Very Long Span Bridges: Concepts,Materials and Methods[R]. Kobe: IABSE,1998: 34-48.
[6]Saul R,林广元. 特大跨度的斜拉桥[J]. 世界桥梁,1991,19(3) : 78-79.
Saul R,Lin Guangyuan. Super long-span cable-stayed bridge[J].World Bridges, 1991,19(3) : 78-79.
[7]严国敏. 试谈四种桥型的最大可能跨度[C]/ /中国土木工程学会桥梁及结构工程学会: 中国土木工程学会桥梁及结构工程学会第九届年会论文集. 北京: 人民交通出版社,1990: 108-104.
Yan Guomin. The Maximum Possible Span of Four Types Bridges[C]/ / China Civil Engineering Society for Bridge and Structural Engineering Institute: 9th Annual Meeting Proceedings of China Civil Engineering Society for Bridge and Structural Engineering Institute.Beijing: China Communications Press, 1990: 108-104.
[8]王伯惠. 斜拉桥的极限跨径: 连载1[J]. 公路,2002(3) : 46-53.
Wang Bohui. Extreme span length of cable-stayed bridge: I [J].Highway,2002(3) : 46-53.
[9]王伯惠. 斜拉桥的极限跨径: 连载2[J]. 公路,2002(4) : 38-48.
Wang Bohui. Extreme span length of cable-stayed bridge: II [J].Highway,2002(4) : 38-48.
[10]张杨永. 自锚式斜拉桥的极限跨径研究(I) [J]. 重庆交通大学学报: 自然科学版,2013, 32(2) : 177-182.
Zhang Yongyong. Study on Limitation Span of Self-anchored CablestayedBridge: I [J]. Journal of Chongqing Jiaotong University:Natural Science,2013,32(2) : 177-182.
[11]邬晓光. 斜拉桥极限跨度分析[J]. 重庆交通学院学报,1996,15(3) : 36-38.
Wu Xiaoguang. Limit span analysis of cable-stayed bridges[J].Journal of Chongqing Jiaotong University,1996, 15(3) : 36-38.